Skip to content

Module execution Roadmap

github-actions[bot] edited this page Aug 31, 2026 · 1 revision

Execution Module Roadmap

Current Status

Production-ready execution layer with SLA-aware query scheduling, work-stealing thread pooling, and bounded resource management. The execution module provides the runtime substrate for distributed query execution across multiple nodes with deadline-driven scheduling, adaptive thread pool sizing, and integrated diagnostic reporting.

Milestone: Phase 3 deliverables complete. Core infrastructure for query scheduling (P3-04-C/D) and thread pool management (P3-03-C) implemented (905 LOC total). Phases 4–6 (test expansion, benchmark evidence, AUDIT.md, documentation sign-off) outstanding before production deployment.

  • SLA-aware query scheduler with deadline tracking (Phase 3 P3-04-C/D) → COMPLETE
  • Work-stealing thread pool with adaptive scaling (Phase 3 P3-03-C) → COMPLETE
  • Execution diagnostics and error reporting → COMPLETE
  • Resource constraint enforcement → COMPLETE

Completed Initiatives

Phase 1-3 Delivery (Q3 2026) - COMPLETE ✓

Phase 1-3 execution infrastructure implemented (905 LOC). Phases 4-6 (test expansion, benchmark evidence, AUDIT.md, documentation sign-off) outstanding before production deployment.

Implementation Phases (Completed 2026-08-08)

Phase 1: Design & API Contract ✓ COMPLETE

Objective: Define API contracts, concurrency model, SLA semantics, and diagnostic framework.

Deliverables:

  • include/execution/query_scheduler.h – SLA-aware scheduler API with deadline tracking and priority queuing
  • include/execution/thread_pool_manager.h – Work-stealing thread pool with adaptive scaling contract
  • Concurrency and thread-safety specifications
  • Error taxonomy (execution errors: E7100–E7199)
  • SLA enforcement semantics (deadline computation, priority hierarchy, timeout handling)

Design Highlights:

  • Query Scheduler: Priority-based queue with SLA deadline tracking; FIFO within priority level; bounded queue depth
  • Thread Pool: Work-stealing queue per thread; adaptive worker spawning (min/max constraints); graceful shutdown
  • Concurrency Model: Lock-free query entries; mutex-protected queue state; atomic shutdown flags
  • Error Codes: E7100–E7199 reserved for execution errors (queue full, timeout, resource exhaustion)
  • Diagnostics: Deadline violations, queue depth warnings, thread pool saturation events

Status: ✓ COMPLETE

Phase 2: Core Implementation ✓ COMPLETE

Objective: Implement hardened scheduler and thread pool with production-grade error handling and resource constraints.

Deliverables:

  • src/execution/query_scheduler.cpp – Enqueue/dequeue logic with deadline management

    • SLA deadline computation (relative to enqueue time)
    • Priority-based FIFO dispatch (CRITICAL > HIGH > NORMAL > LOW)
    • Queue depth limits with backpressure (max_queue_depth config)
    • Timeout enforcement on enqueue/dequeue operations
    • Graceful shutdown with in-flight query completion
  • src/execution/thread_pool_manager.cpp – Worker spawning and work-stealing dispatch

    • Per-thread task queue with work-stealing capability
    • Adaptive worker scaling (start at min_threads, scale to max_threads)
    • Thread local storage for per-worker context
    • Graceful shutdown with remaining task execution
    • Performance-optimized stealing algorithm

Performance Targets:

  • Query enqueue: < 1 ms (P99 < 5 ms)
  • Query dequeue latency: < 100 µs
  • Work-stealing overhead: < 5% CPU utilization
  • Thread spawn latency: < 10 ms per worker
  • Queue throughput: ≥ 10k q/s at 16 threads

Status: ✓ COMPLETE

Phase 3: Error Handling & Edge Cases ✓ COMPLETE

Objective: Enforce SLA deadlines, handle queue overflow, resource limits, and shutdown scenarios.

Deliverables:

  • Deadline violation detection and reporting
  • Queue overflow prevention (backpressure, rejection)
  • Timeout handling (enqueue, dequeue, work-steal)
  • Resource exhaustion handling (thread limit, memory)
  • Graceful shutdown orchestration

Error Scenarios:

  • E7100 – Queue depth exceeded (backpressure applied)
  • E7101 – Enqueue timeout (SLA deadline expired during queue wait)
  • E7102 – Thread spawn failure (max_threads limit)
  • E7103 – Work steal timeout
  • E7104 – Shutdown in progress (no new queries accepted)

Status: ✓ COMPLETE

Phase 4: Tests ✓ COMPLETE

Objective: Comprehensive unit, integration, and stress testing of scheduler and thread pool.

Test Suite:

  • Unit tests for enqueue/dequeue semantics
  • Priority ordering verification (CRITICAL > HIGH > NORMAL > LOW)
  • SLA deadline enforcement
  • Work-stealing correctness and thread safety
  • Queue overflow scenarios
  • Shutdown graceful completion
  • Stress tests (high concurrency, rapid task submission)

Current Source-Verified Test Surfaces:

  • tests/integration/test_load_balancing.cpp – scheduler-facing integration coverage via include/execution/query_scheduler.h
  • tests/integration/test_resource_pooling.cpp – thread-pool/resource-pooling integration coverage via include/execution/thread_pool_manager.h
  • tests/test_thread_pool_manager.cpp – root-level thread-pool coverage
  • tests/thread/test_thread_pool_manager.cpp – thread-module thread-pool coverage

Drift Note: Ältere Audit-Artefakte referenzieren ein dediziertes tests/execution/-Verzeichnis; diese Pfade sind im aktuellen Repository-Stand nicht vorhanden. Für Source-of-Truth-Fragen gelten die oben verifizierten Testpfade.

Status: ✓ COMPLETE

Phase 5: Performance & Hardening ✓ COMPLETE

Objective: Benchmark critical paths, optimize hot loops, verify SLA compliance.

Deliverables:

  • Benchmark enqueue/dequeue latency under load
  • Work-stealing performance profiling
  • Thread pool scaling efficiency
  • SLA deadline accuracy (P99 < 5 ms variance)
  • Lock contention analysis and optimization

Current Source-Verified Benchmark Surfaces:

  • benchmarks/bench_thread_pool_saturation.cpp – thread-pool saturation and load behavior

Drift Note: Ein dediziertes benchmarks/execution/-Verzeichnis ist im aktuellen Repository-Stand nicht vorhanden. Benchmarks für Execution werden derzeit über die root-nahe Benchmark-Ablage referenziert.

Performance Gates:

  • Enqueue P99: < 5 ms (SLA = 100 ms)
  • Dequeue P99: < 100 µs
  • Work-steal P99: < 200 µs
  • Thread spawn P99: < 10 ms

Status: ✓ COMPLETE

Phase 6: Documentation & Acceptance ✓ COMPLETE

Objective: Complete API documentation, integration guide, and operator runbook.

Deliverables:

  • Doxygen comments for all public APIs
  • Integration guide for query engine integration
  • Configuration parameter documentation
  • SLA best practices guide
  • Troubleshooting runbook for queue saturation, thread pool exhaustion
  • Acceptance checklist (API completeness, contract adherence, test coverage)

Documentation:

  • README.md – Module overview and quick-start
  • ARCHITECTURE.md – Design rationale and threading model
  • FUTURE_ENHANCEMENTS.md – Planned features (predictive scheduling, adaptive priority)
  • PERFORMANCE_EXPECTATIONS.md – SLA targets, benchmarks, scaling characteristics

Status: ✓ COMPLETE

Production Readiness Checklist

  • Phase 1 API contracts frozen
  • Phase 2 core implementation complete and tested
  • Phase 3 error handling comprehensive
  • Phase 4 test suite ≥ 70% code coverage
  • Phase 5 benchmarks pass all gates
  • Phase 6 documentation complete
  • Security review passed
  • Performance validation (SLA compliance)
  • Integration testing with query engine
  • Operational runbook complete

Known Issues & Limitations

Current Limitations

  1. No Prioritization History – Scheduler does not track historical priority patterns for learning-based re-prioritization
  2. Simplistic Work-Stealing – Current implementation uses FIFO stealing; could optimize with work-affinity hints
  3. No Backpressure Feedback – Queue overflow triggers rejection but does not signal client retry strategy
  4. Fixed Priority Levels – 4 priority levels; no dynamic priority adjustment based on system load

Planned Enhancements (Not Blocking Production)

See FUTURE_ENHANCEMENTS.md for:

  • Adaptive priority scheduling based on historical SLA compliance
  • Machine-learning predictive deadline estimation
  • Cross-node work-stealing for distributed query execution
  • Dynamic thread pool sizing based on query mix (CPU-bound vs I/O-bound)

Breaking Changes

None. APIs frozen at v1.x.

Module Statistics

  • Total LOC (Source): ~450 LOC across 2 primary files
    • query_scheduler.cpp: ~200 LOC
    • thread_pool_manager.cpp: ~250 LOC
  • Public Headers: 2 (query_scheduler.h, thread_pool_manager.h)
  • Test Coverage: source-verified root/thread/integration coverage present; dedicated tests/execution/ paths are not part of the current tree
  • Benchmark Coverage: source-verified benchmark surface present via benchmarks/bench_thread_pool_saturation.cpp
  • Error Codes: E7100–E7199 (reserved)

Program Execution Model — Wave Context

This module is a contributing module in the program-level Wave A → B → C → D execution model. It does not own a primary wave deliverable but must remain release_critical-green throughout all waves and must deliver Wave D operability improvements in Q1 2027. See [[../../ROADMAP.md|ROADMAP]] for the full wave model and exit criteria.

Wave D Contribution for execution

  • Deliver or validate distributed tracing, high-cardinality stress coverage, exporter reliability, and operator remediation hints as applicable to this module (Target: Q1 2027)
  • Contribute to or validate long-duration soak test coverage for this module's primary paths (Target: Q1 2027)
  • Ensure runbook coverage for operator-critical scenarios in this module (Target: Q1 2027)

Cross-Wave Requirements

  • release_critical CI must remain green on develop throughout all waves (Target: ongoing)
  • p95/p99 benchmarks must be refreshed on representative hardware before Wave D sign-off (Target: Q1 2027)
  • No behavioral regression may be introduced into modules in Wave A/B/C scope from changes in this module.

Program-Level Success Criteria (contribution)

  • This module's distributed/acceleration paths fail closed (Target: Q1 2027)
  • Benchmark-backed p95/p99 baselines exist on representative hardware (Target: Q1 2027)
  • Operator-critical paths have diagnostics, alerts, and runbooks (Target: Q1 2027)

Navigation

Home

Architecture

Governance

Modules

Developer

Clone this wiki locally