track: refresh work mirror and projection - #462

Open
The-Running-Dev wants to merge 3 commits into
mainfrom
feature/track-82c8ea
Open

track: refresh work mirror and projection#462
The-Running-Dev wants to merge 3 commits into
mainfrom
feature/track-82c8ea

Conversation

@The-Running-Dev

Copy link
Copy Markdown
Owner

Summary

  • Closed W106 — Tracker Evidence Closure #394 (W106 — Tracker Evidence Closure): all 7 acceptance criteria were already checked in the issue body.
  • Refreshed design/state/work/394.md and design/state-index.md to reflect that closure (tools/Update-WorkMirror.ps1 + tools/Update-DesignProjection.ps1).

Note: CLAUDE.md's carve-out for committing this refresh straight to main assumed a push would succeed; this repository's ruleset blocks direct pushes to main even for admins ("Changes must be made through a pull request", 3/3 required status checks), so this went through the normal PR path instead.

Test plan

  • tools/Update-WorkMirror.ps1 exit 0, wrote 1 record
  • tools/Update-DesignProjection.ps1 exit 0

Both issues (#393, #394) are closed with every acceptance criterion
checked, but the slice headings still read [ ] / "Not started" — the
exact drift W106.5 itself names ("no implemented unit whose heading
remains unchecked").
design/30-slices.md changed in 008b4d8; docs/docs/engine/TODO.md and
design/TODO.md were stale until regenerated.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

W106 — Tracker Evidence Closure