Skip to content

Integrate retired allocation client removal into staging #114

Closed

Description

@adrianwebb

Platform #520; user explicitly requires all existing work merged and clean current staging before acceptance resumes. Integrate the existing codex/agent-retire-allocation-authoring commits through a bounded checked staging PR. Preserve unrelated work, run owner-language regression tests and required Actions, no new releases/tags or acceptance policy overrides. This is integration of existing architecture work, not UI redesign. Record exact base/head and verification in the PR; return the checkout to staging.

Accepted integration

PR #115 merged after required Verify 36730756568 passed full build, 184 tests, independent Pages build and npm package verification; exact UI dependency came from accepted staging artifact b0c9a2bdf1eed181950c1202a24ab3d9af012833. Checkout returned clean staging 68b8391. Portable asset resolution is covered by the existing brand-assets test. This is owner-package integration, not SDK golden acceptance.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions