You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Integrate retired allocation client removal into staging #114
Platform #520; user explicitly requires all existing work merged and clean current staging before acceptance resumes. Integrate the existing codex/agent-retire-allocation-authoring commits through a bounded checked staging PR. Preserve unrelated work, run owner-language regression tests and required Actions, no new releases/tags or acceptance policy overrides. This is integration of existing architecture work, not UI redesign. Record exact base/head and verification in the PR; return the checkout to staging.
Accepted integration
PR #115 merged after required Verify 36730756568 passed full build, 184 tests, independent Pages build and npm package verification; exact UI dependency came from accepted staging artifact b0c9a2bdf1eed181950c1202a24ab3d9af012833. Checkout returned clean staging 68b8391. Portable asset resolution is covered by the existing brand-assets test. This is owner-package integration, not SDK golden acceptance.
Activity
Verify Admin with exact integrated UI artifact (#114)
Resolve test assets outside the Vitest module runner (#114)
Integrate retired allocation path removal on staging (#115)