Skip to content

Milestones

List view

  • Scale-out layer on the PoC: self-hostable hub with lease-based claims, index federation, earned-only reputation, project-side verification checks. Release window: opens after v3.19.0 closes (2026-10-08) and ships in the following release. An issue carries exactly one milestone, so this work is tracked as an epic here rather than under a version. Depends on milestone 26 landing first. Board view (Category / Maturity / Area): https://github.com/orgs/sipyourdrink-ltd/projects/1

    Due by October 15, 2026
    0/19 issues closed
  • Coordinator-less proof of concept: a donor runs a worker locally on their own credentials, picks tasks from opt-in projects, and returns verified patches with signed replayable receipts. No central service required. Release window: v3.17.0 (same due date, 2026-09-10). An issue carries exactly one milestone, so this work is tracked as an epic here rather than under a version — this line is where the release mapping lives. Board view (Category / Maturity / Area): https://github.com/orgs/sipyourdrink-ltd/projects/1

    Due by September 10, 2026
    12/25 issues closed
  • Runtime semantics: scheduler and DAG edge cases, spawn fidelity, sampling-parameter enforcement, metrics reliability.

    Due by October 8, 2026
    0/7 issues closed
  • Adapters: contract truth for the CLIs we drive, structured-event wiring, and probe-based adapter onboarding.

    Due by September 24, 2026
    3/19 issues closed
  • Receipts and replay: the verifiability surface — audit chain, lineage, journal verification, checkpoint grants — proven end-to-end with no known correctness gaps.

    Due by September 10, 2026
    37/88 issues closed
  • Architectural and breaking work: zero-code adapter onboarding, CLI surface consolidation, web UI maturation. Scoped by content, not by date.

    No due date
    8/84 issues closed