Skip to content

test #7132

Closed
Closed

Description

@AlexHentschel

Problem Definition

What problem is this solving?

Proposed Solution

What are the proposed solutions to this problem?

Definition of Done

What tests must pass for this issue to be considered solved?

Actions Needed Before Submitting

Update ticket status using the following (remove this section once ticket created)

  • What workstream does this ticket deal with? Find the appropriate 'S-' label and add that label.
  • Is it a specific 'type' of ticket (ex: bug, documentation)? If yes, add that label as well.
  • Is this ticket related to an overarching theme (ex: architecture, performance)? If yes, add that label as well.
  • Add any/all descriptive characteristic labels needed (ex: Needs Estimation, Needs Test Cases).
  • Now we should determine what release this ticket is associated with. If none, leave it blank. If it is associated with a specific release, please add it to the appropriate release.
  • If this ticket is associated with a release, we want to assign it a level of importance within that release. These labels follow the standard MoSCoW method rules. We want to look at releases and then the importance of tickets within those specific releases. So the MoSCoW label is ONLY valid when it is taken in conjunction with its release.
  • Assign this ticket a priority level (High, Medium, Low) via the appropriate label. These labels control the importance of the ticket within the sprint. For example, all P-High tickets should be worked on first, then P-Medium, then P-Low. This gives us an easy way to identify the order of priority for tickets within a specific sprint.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions