Perform any final adjustments to the code optimization after flight test #3 Deliverable: Optimized SAMURAI for Commissioning and Operations
Due by June 1, 2027Continue to work with CSU for optimization in iterative process between flight test #2 and #3 Develop optimization for handling of the full APAR system Deliverable: Optimized SAMURAI for flight test #3 (real-time, multi-panel operations)
Due by May 1, 2027•0/3 issues closedWork with CSU for new optimization in iterative process between test flights #1 and #2 Test optimization with data from test flight #1 or with multiple AESAs in the simulated environment Begin optimization will full APAR system using simulated data Deliverable: Optimized SAMURAI for flight test #2 and real-time operations (1 AESA panel)
Due by September 1, 2026•0/4 issues closedSAMURAI with terrain Optimization (V3) – For flight test #1 - Includes optimization of SAMURAI with terrain and thermodynamics, ML PID/QPE prototype - Testing with up to two AESA panels (output from AOS - APAR observing Simulator?) - Deliverable: Optimized SAMURAI for flight test #1 Updates: FT1 pushed to 2026, ground test will still be 2025
Overdue by 1 year(s)•Due by May 30, 2025•24/37 issues closed