Milestones

List view

  • Perform any final adjustments to the code optimization after flight test #3 Deliverable: Optimized SAMURAI for Commissioning and Operations

    Due by June 1, 2027
  • Continue to work with CSU for optimization in iterative process between flight test #2 and #3 Develop optimization for handling of the full APAR system Deliverable: Optimized SAMURAI for flight test #3 (real-time, multi-panel operations)

    Due by May 1, 2027
    0/3 issues closed
  • Work with CSU for new optimization in iterative process between test flights #1 and #2 Test optimization with data from test flight #1 or with multiple AESAs in the simulated environment Begin optimization will full APAR system using simulated data Deliverable: Optimized SAMURAI for flight test #2 and real-time operations (1 AESA panel)

    Due by September 1, 2026
    0/4 issues closed
  • SAMURAI with terrain Optimization (V3) – For flight test #1 - Includes optimization of SAMURAI with terrain and thermodynamics, ML PID/QPE prototype - Testing with up to two AESA panels (output from AOS - APAR observing Simulator?) - Deliverable: Optimized SAMURAI for flight test #1 Updates: FT1 pushed to 2026, ground test will still be 2025

    Overdue by 1 year(s)
    Due by May 30, 2025
    24/37 issues closed