Repository navigation
Release v0.2.0: integrate IEC 61850 engineering workbench - #104
Merged
Merged
Conversation
Promote exact-head release candidate after 18/18 successful workflows.
Owner
Author
Final integration gateAuthoritative integration head: This commit has:
Keep Draft until the exact-head integration matrix is fully successful. |
masarray
marked this pull request as ready for review
September 19, 2026 15:16
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Purpose
Integrate the validated v0.2.0 IEC 61850 engineering workbench onto the current
mainwithout regressing newer mainline work.Provenance
f39a406aebc285f23726307670fd1c186b7ecf117093aad60e2c9d4ab4023a8166c8524df1f83453f50a3aea1f1748298cf7e3a18e813519e81e41d8— 18/18 workflows successful28643ecb566b16bed88a49dc839afe3b11f2bf32The integration tree was built from current main and overlays the simulator changes from their common ancestor. Only overlapping files were resolved explicitly; main-only changes remain preserved.
Gate
Keep this PR Draft until the exact integration-head CI matrix is green. Do not release from the old diverged simulator PR path.