G2.5-B: fail-closed shadow report/direct-read verification - #227
Draft
masarray wants to merge 4 commits into
Draft
G2.5-B: fail-closed shadow report/direct-read verification#227masarray wants to merge 4 commits into
masarray wants to merge 4 commits into
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Status
G2.5-B is CODE/CI READY but PHYSICAL-A1 BLOCKED. It is a stacked draft on top of the frozen G2.5-A/A1 branch and is intentionally NOT operator-runnable yet.
Do not merge or expose G2.5-B until physical G2.5-A1 PASS proves a real qualified-member transition correlated with a spontaneous dchg report.
Parent A1 physical candidate remains immutable at
547fd5be3e73a07e3a4b4b84984a08373b08207b. ARIEC61850 remains pinned to physical-proven26c85400a4da230c4429e6302847f230385b6687.Exact G2.5-B code-ready head:
6bc3cd26d1b33274241c7b4ab0e915743fd282b0.G2.5-B contract
DynamicReportStimulusWitnessCommissioningResult.IsSuccess, stimulus witness proven, report correlation proven, non-empty correlated indexes, complete underlying G2.5-A activation/report proof, monitor cleanup, proof-field restore, and fresh cleanup closure;reason-for-inclusion=data-changeonly;ProductionEligible, no production policy change;AllowDynamicBrcb/Urcbremains OFF.Scope
New files only:
Services/DynamicReportShadowVerificationService.cstests/ARSAS.Tests/DynamicReportShadowVerificationServiceTests.csNo G2.5-A/A1 runtime source is modified by G2.5-B.
CI — exact head
6bc3cd26...32453061941— PASS32453061978— PASSArtifacts
9436356301, SHA-256067c9e5dfaae329208005b80a411744da3ff4a13addba8308cf726141c43552f9436341588, SHA-256c86441f7f152f89b5a2feda3208bb5bbe211181df53b6ffbe140ac3a5d4ed9df9436312846, SHA-25614f060980b578791502479a9acd80aee5ff02c317dbc42f17d63b43db99572a6Remaining prerequisite
Physical G2.5-A1 must PASS before G2.5-B receives runtime wiring/operator entrypoint. Until then this PR stays draft and stacked on the A1 branch.
Production automatic dynamic reporting remains OFF.