Skip to content

Milestones

List view

  • Now-actionable wave from the 2026-07-17 standards review: the WRPRC parser against the final ETSI TS 119 475 (CIR 2025/848 applies 2026-12-24), the third-party vp_token capture, the pyld 3.x / PyJWT 2.13 dependency refresh, Python 3.15 in CI, the draft→RFC cite swaps, and the CLAUDE/ROADMAP documentation truth pass. Context: plans/PLAN-2026-H2b.md (local).

    Due by December 22, 2026
    5/7 issues closed
  • Deferred follow-ups from the 2026-07-10 audit waves (#9/#10) that each need a real signed artifact or a launched external service before they can be done — not gated forever, actionable once the artifact/service exists. Replaces the local plan file as the tracking home.

    No due date
    3/5 issues closed
  • The 2027 horizon: post-quantum credentials (RFC 9964), the BBS gate re-evaluation, the W3C 1.1/2.1 maintenance wave + DID 1.1, an external security review, and the 2.0 breaking-cleanup window.

    No due date
    2/5 issues closed