Skip to content

Milestones

List view

  • Round 3 (2026-07-17). Calendar-driven bets and the refreshed quarterly spec radar (vc-di-bbs, Render/Confidence Method, v1.1 cryptosuite drafts, ML-DSA, ELM/Europass).

    No due date
  • Round 3 (2026-07-17). The December events, then the audit: EUDI checkpoint (SD-JWT VC RFC + HAIP 1.1 expected 2026-12-21, wallet deadline 2026-12-24), the gated Token Status List and OpenID4VP decisions, and the Round-3 deep audit scheduled for January 2027.

    Due by January 31, 2027
    0/4 issues closed
  • Round 3 (2026-07-17, standards-calendar analysis). Close the v4 cycle and absorb the ecosystem: drop Python 3.10, Python 3.15 readiness, refresh the cryptography floor, ship v4.0.0 in the announced October window (2026-10-01 Python 3.15.0 -> 2026-10-31 Python 3.10 EOL).

    Due by October 31, 2026
    0/4 issues closed