Skip to content

Implement Phase 5: graph orchestrator - #8

Merged
lonestarx1 merged 2 commits into
mainfrom
phase5
Feb 16, 2026
Merged

Implement Phase 5: graph orchestrator#8
lonestarx1 merged 2 commits into
mainfrom
phase5

Conversation

@lonestarx1

Copy link
Copy Markdown
Owner

Summary

  • Add graph orchestration pattern with conditional edge routing, parallel fan-out, fan-in merging, and loop support with configurable iteration limits
  • Wave-based concurrent execution engine: ready nodes run in parallel, successors fire when all incoming dependencies are satisfied
  • Fluent Builder API (NewBuilderAddNodeAddEdgeBuild) with validation for duplicate nodes and unknown edge references
  • Graphviz DOT export for visualization, cost budgets, timeouts, and full tracing integration
  • 25 tests covering builder validation, edge conditions, fan-out/fan-in, loops, max iterations, timeouts, cost budgets, and usage aggregation
  • Website docs updated with Graph, Graph Builder, and Loops & Conditions sections
  • Examples page updated with Review Loop Graph example

Test plan

  • All 25 graph tests pass with -race
  • All existing tests pass (backward compatible)
  • Website builds successfully
  • go vet ./... passes

Add the graph orchestration pattern supporting conditional edge routing,
parallel fan-out, fan-in merging, and loop detection with configurable
iteration limits. Execution uses a wave-based model where ready nodes
run concurrently and successors fire when all dependencies are satisfied.

Includes fluent Builder API, Graphviz DOT export, cost budgets, timeouts,
and full tracing integration. 25 tests covering builder validation, edge
conditions, fan-out/fan-in, loops, max iterations, timeouts, cost budgets,
and usage aggregation.

Updates website docs with Graph, Graph Builder, and Loops & Conditions
sections. Adds review-graph example to examples page.
@vercel

vercel Bot commented Feb 16, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
gogrid Ready Ready Preview, Comment Feb 16, 2026 10:00am

@lonestarx1
lonestarx1 merged commit 2d6eb0c into main Feb 16, 2026
5 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant