Skip to content

chore(release): prepare 0.1.0-rc.2 - #2

Merged
zsumz merged 1 commit into
mainfrom
agent/release-0.1.0-rc.2
Aug 13, 2026
Merged

chore(release): prepare 0.1.0-rc.2#2
zsumz merged 1 commit into
mainfrom
agent/release-0.1.0-rc.2

Conversation

@zsumz

@zsumz zsumz commented Aug 13, 2026

Copy link
Copy Markdown
Member

Release

Prepare kafka-wire 0.1.0-rc.2 without changing the wire surface.

Changes

  • advance all workspace package identities and internal constraints to 0.1.0-rc.2
  • refresh both lockfiles and the executable release contract
  • regenerate the checked tree with the rc.2 generator identity
  • close the post-rc.1 changelog section and mark rc.2 as current in the README

Verification

  • complete repository gate across generation, architecture, 1,392 byte vectors, 18 RecordBatches, formatting, Clippy, tests, and rustdoc
  • extracted-package qualification for all three public rc.2 archives
  • locked fuzz metadata, deterministic seed verification, all five fuzz builds, and 256-run smoke campaigns
  • cargo-deny policy
  • 669 public API compatibility checks against signed v0.1.0-rc.1
  • actionlint and ShellCheck
  • signed zsumz release commit

No tag, crates.io package, or GitHub release is created until this exact commit passes every protected hosted check.

@zsumz
zsumz merged commit 59bc584 into main Aug 13, 2026
7 checks passed
@zsumz
zsumz deleted the agent/release-0.1.0-rc.2 branch August 13, 2026 21:21
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant