feat(M13.4): link Yukawa Compton cutoff to Ryu-Takayanagi entropy - #163
Closed
jagg-ix wants to merge 1 commit into
Closed
feat(M13.4): link Yukawa Compton cutoff to Ryu-Takayanagi entropy#163jagg-ix wants to merge 1 commit into
jagg-ix wants to merge 1 commit into
Conversation
Owner
Author
|
Validation audit:
The attached workflow is the repository's existing M11 compile/ledger/test job; it is green but does not replace the focused M13.4 local campaign. No workflow file was added or modified. |
Owner
Author
|
Superseded by #164. The complete M13.4 Yukawa/Compton RT bridge is preserved there together with M13.5 in one direct-to-main commit. This PR is being closed without merging. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
M13.4
Builds on M13.3 by using the Yukawa-generated Compton wavelength as an explicit ultraviolet-cutoff adapter for the finite Ryu--Takayanagi/CFT interval entropy.
Executable bridge
S=A/(4G);Formal authority
Pins the exact RT, horizon-entropy mass, three-origin Compton-clock, Yukawa entropy-rate, and scale-dilation source blobs on
entropic-physlib-linear-full@8bafa9ab.Claim boundary
The Compton wavelength is an explicit model choice for the RT/CFT cutoff. The equality between Yukawa mass and horizon-area-rate mass remains a supplied bridge hypothesis. RT minimal-surface area is not identified with horizon area growth.
Validation
Stack
main -> #162 (M13.3) -> this PR (M13.4)Branch audit
agent/m13-yukawa-dilation-gkp-133@fc42a69083840a000f18e53326e14acbba89283372ffc74673d9b85f1ad0845daf1ac22a4533544c