Skip to content

Consolidate Rev-B routing, validation, and repository cleanup - #10

Draft
iamdarshg wants to merge 64 commits into
mainfrom
agent/rev-b-fab-ready
Draft

Consolidate Rev-B routing, validation, and repository cleanup#10
iamdarshg wants to merge 64 commits into
mainfrom
agent/rev-b-fab-ready

Conversation

@iamdarshg

@iamdarshg iamdarshg commented Jul 19, 2026

Copy link
Copy Markdown
Owner

Consolidated scope

This is the single active Rev-B hardware PR. It supersedes temporary export PRs #8 and #9.

  • runs KiCad ERC, netlist export, connectivity audits, DRC, and PCB-layout audits
  • regenerates both Rev-B designs in an isolated copy with the installed KiCad symbol/footprint libraries
  • publishes a structured readiness summary and source bundle as workflow artifacts
  • preserves known design blockers as report data instead of confusing them with CI infrastructure failures
  • removes generated BEC SVG output and tracked KiCad editor-preference files
  • expands .gitignore for hardware exports and transient output directories

Current hardware state

  • flight-control board: routed checkpoint retained; final routing/DRC completion remains in progress
  • six-channel ESC: engineered power zones/via fields retained; signal routing and final DRC remain in progress
  • fabrication exports remain blocked until the reported connectivity and layout failures are resolved

The PR remains draft until both PCB designs pass the final fabrication-readiness gates.

@iamdarshg iamdarshg changed the title Finish Rev-B fabrication readiness Consolidate Rev-B routing, validation, and repository cleanup Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg
iamdarshg force-pushed the agent/rev-b-fab-ready branch from e42db4f to 6c1bdcc Compare July 19, 2026 13:35
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg
iamdarshg force-pushed the agent/rev-b-fab-ready branch from 526cddb to 6c1bdcc Compare July 19, 2026 13:50
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@github-actions
github-actions Bot force-pushed the agent/rev-b-fab-ready branch 2 times, most recently from 609b4e7 to 537ca32 Compare July 19, 2026 14:12
@iamdarshg iamdarshg closed this Jul 19, 2026
@iamdarshg iamdarshg reopened this Jul 19, 2026
@github-actions
github-actions Bot force-pushed the agent/rev-b-fab-ready branch from 306826a to bccbe96 Compare July 19, 2026 14:15
@github-actions
github-actions Bot force-pushed the agent/rev-b-fab-ready branch from bccbe96 to 492992f Compare July 19, 2026 14:16
@iamdarshg iamdarshg closed this Jul 19, 2026
iamdarshg and others added 30 commits July 20, 2026 13:03
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant