You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
PROJ-025/EPIC-001: Dependency Update Flow — unblock the Dependabot backlog #415
What this is: the tracking issue for keeping Jerry's dependencies current through Dependabot. It belongs to PROJ-025, the tactical-work project for Q4 2026.
Why now: ten open Dependabot pull requests are blocked. Each one fails the same nine of its fifteen CI checks: the eight "Test uv" matrix jobs and the "CI Success" gate. main has not changed since 2026-08-13, when its CI last passed. Meanwhile the daily security scan reports known vulnerabilities in six packages that these pull requests update (see #385).
Goal: fix the shared CI failure once, land the queued updates without weakening any test, and keep main green.
Children: one feature issue, linked below as a sub-issue. Its enabler sub-issue lists the pull requests, the observed facts, and the risks.
Tracking: worktracker epic EPIC-001, in projects/PROJ-025-tactical-work-q4y2026/work/EPIC-001-dependency-update-flow/ on the PROJ-025 working branch until it merges. This issue stays open until the backlog lands on main.
Activity