Skip to content
This repository was archived by the owner on May 24, 2024. It is now read-only.
This repository was archived by the owner on May 24, 2024. It is now read-only.

Carbon Gantt minimum chunk width not honored unless start/end dates are identical #141

Description

@Matthematic

Bug Report

Description

We have received a complaint from a client about tasks being drawn extremely skinny:
image

Looking into this, I found that there is no problem with the data that is generating that task - it is technically correct - but that we need to support a minimum width on tasks to prevent that situation. Currently, Gantt supports a "chunk" task which I believe was intended to enforce a minimum width on tasks. However this only works if the start and end dates are identical, which I believe can be considered a bug since a truly robust enforcement of minimum width would have to compare to the start/end dates of the graph itself to determine expected size.

Graphs affected

  • Bar graph
  • Bubble graph
  • Gantt chart
  • Line graph
  • Paired result
  • Pie chart
  • Scatter plot
  • Timeline

Steps to Reproduce

  1. Render a Gantt graph
  2. Draw a task with start and end dates only 1 minute apart

Link to CodeSandbox

https://codesandbox.io/s/empty-fast-ch35j

Additional Context / Screenshots

Expected Behavior

I would expect the same minimum chunk width to get applied in this scenario

Possible Solution

Environment

  • Component Name and Version:
  • Browser Name and Version:
  • Node/npm Version: [e.g. Node 8/npm 5]
  • Webpack Version:
  • Operating System and version (desktop or mobile):

@ Mentions

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions