Skip to content

docs: mark Story 10.2 live validation in progress - #123

Open
cbwinslow wants to merge 3 commits into
mainfrom
docs/117-live-validation-state
Open

cbwinslow wants to merge 3 commits into
mainfrom
docs/117-live-validation-state

Conversation

@cbwinslow

Copy link
Copy Markdown
Owner

Synchronizes committed BMAD/project state after PR #122.

No data transfer, schema change, or source expansion.

@coderabbitai

coderabbitai Bot commented Oct 5, 2026 •

Copy link
Copy Markdown

Review in Change Stack →

Navigate logical layers of code changes, visualize relationships, and explore their blast radius.

🧰 Additional context used
📚 Code guidelines (1)
AGENTS.md — configured

No actionable comments were generated in the recent review. 🎉

ℹ️ Recent review info
⚙️ Run configuration
  • Configuration used: Organization UI
  • Review profile: ASSERTIVE
  • Plan: Advanced
  • Run ID: e3cf8dcf-984d-4772-a036-3ecdd11f162d
📥 Commits

Reviewing files that changed from the base of the PR and between 95fd1dc and 00cc044.

📒 Files selected for processing (3)
  • _bmad-output/specs/spec-district-linked-context/stories.yaml
  • docs/PROJECT-STATE.md
  • docs/research/2026-10-05-district-data-source-verification.md

Included review availability: This review used your included allowance. Your plan provides up to 1 included review per hour; 0 remain after this review.


Summary by CodeRabbit

  • Documentation
    • Updated project-status documentation to reflect that district data work remains in progress pending a live warehouse run and additional validation.
    • Refreshed verification records with the latest checks of expected source-file counts, noting that live processing must confirm its own results.
    • Clarified the current scope and prerequisites for subsequent data work.

Walkthrough

Story 10.2 is marked in progress. The project handoff records it as merged while listing evidence still required for completion. The verification note records rechecked publisher ZIP-member counts and states that the live plan must rediscover and reconcile them.

Changes

District Story 10.2 status

Layer / File(s) Summary
Story status and project handoff
_bmad-output/specs/spec-district-linked-context/stories.yaml, docs/PROJECT-STATE.md, docs/research/2026-10-05-district-data-source-verification.md
Story 10.2’s status changes to in_progress. The handoff records the merged scope and outstanding completion evidence. The verification note records rechecked publisher ZIP-member counts and requires the live plan to rediscover and reconcile its counts.

Priority: ⬇️ Low

Estimated code review effort: 1 (Trivial) | ~5 minutes

Change: Other

Merge Risk: ⚪ Minimal · up to 00cc0

Story 10.2 remains open until the required warehouse evidence is collected. This update records that gate without changing the data pipeline, so no actionable merge-blocking risk is established.

Architecture Summary

Architecture risk: 🔵 Low · up to 00cc0

The change affects 2 systems.

Changed systems: docs, _bmad-output

Architecture concerns
No architecture-level concerns identified.

Review details

Systems and components

  • observed — docs (service) was modified; 2 changed files map to changed impact.
  • observed — _bmad-output (service) was modified; 1 changed file maps to changed impact.

Before / after behavior

  • observed — Modified behavior in _bmad-output/specs/spec-district-linked-context/stories.yaml: Story 10.2’s status changed from ready to in_progress.
  • observed — Modified behavior in docs/PROJECT-STATE.md: The status changes from an approved, frozen programme with Story 10.2 as the next build to Story 10.2 merged but still in progress. The handoff adds its implemented 2024 geography acquisition, validation, promotion, provenance, and reconciliation work; lists the real-run evidence required for completion; and states that Story 10.3 / #118 remains blocked. It preserves the narrow first-proof scope and Story 10.6 gate, and removes the earlier statement that code still loaded only state/county/CBSA/ZCTA and that no district data had been ingested by the planning change.
  • observed — Modified behavior in docs/research/2026-10-05-district-data-source-verification.md: Added the rechecked directory and total ZIP-member counts, and clarified that they are review evidence; the live warehouse plan must rediscover the publisher manifest and reconcile its exact counts.
🚥 Pre-merge checks | ✅ 5
✅ Passed checks (5 passed)
Check name Status Explanation
Title check ✅ Passed The title clearly states that the change updates documentation to mark Story 10.2 live validation as in progress.
Description check ✅ Passed The description accurately summarizes the project-state updates and notes that live warehouse validation remains outstanding.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check. Docstring coverage is scoped to functions touched by this diff. Analyzed 0 functions across 0…
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Commit to this branch
  • Create a new PR
  • Autopilot · Keep fixing CodeRabbit findings and required CI, and resolving merge conflicts

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant