Skip to content

[Failing Test]: Flink 1.20 portable DataSet ValidatesRunner tests hang #40645

Open

Description

@aIbrahiim

What happened?

A few Flink 1.20 portable DataSet tests never finish. The job stays RUNNING until waitUntilFinish hits the 20 min timeout.

This is already happening on master. #40632 skips them for DataSet only so workflow can get through, but we still need a real fix because 1.20 is LTS

The ones we’ve seen:

  • CombineTest$WindowingTests.testWindowedCombineGloballyAsSingletonView
  • FlattenTest.testFlattenPCollections
  • MapViewTest.testMapSideInput
  • ParDoTest$MultipleInputsAndOutputTests.testSameSideInputReadTwice
  • ParDoTest$TimerTests.testEventTimeTimerBounded
  • SplittableDoFnTest.testWindowedSideInputBounded
  • ViewTest.testEmptyListSideInput

https://github.com/apache/beam/actions/runs/38961839107/job/117178555850

Issue Failure

Failure: Test is continually failing

Issue Priority

Priority: 1 (unhealthy code / failing or flaky postcommit so we cannot be sure the product is healthy)

Issue Components

  • Component: Python SDK
  • Component: Java SDK
  • Component: Go SDK
  • Component: Typescript SDK
  • Component: IO connector
  • Component: Beam YAML
  • Component: Beam examples
  • Component: Beam playground
  • Component: Beam katas
  • Component: Website
  • Component: Infrastructure
  • Component: Spark Runner
  • Component: Flink Runner
  • Component: Prism Runner
  • Component: Twister2 Runner
  • Component: Hazelcast Jet Runner
  • Component: Google Cloud Dataflow Runner

Activity

  1. aIbrahiim commented on Oct 17, 2026

    @aIbrahiim
    ContributorAuthor
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions