Skip to content

docs: close out the example-expansion milestone; PHASE-NEXT becomes the platform roadmap#21

Merged
ryandmonk merged 1 commit into
mainfrom
docs/milestone-closeout
Jul 22, 2026
Merged

docs: close out the example-expansion milestone; PHASE-NEXT becomes the platform roadmap#21
ryandmonk merged 1 commit into
mainfrom
docs/milestone-closeout

Conversation

@ryandmonk

Copy link
Copy Markdown
Contributor

Documentation-only pass closing the example-expansion milestone.

  • IMPLEMENTATION_LOG: permanent close-out record (PRs tour: auto-start for first-time visitors #16-scenario: hotel reservations ships ready (transactional-review) #20, dspack-gen 0.1.2, final verified inventory and gates, deliberate deferrals).
  • PHASE-NEXT: rewritten from the delivered WS0-WS3 plan into the platform roadmap (P0-P5). One finding surfaced by the audit and documented rather than papered over: the byte-sync standing constraint is currently unmet — this milestone authored governance in the studio contract through reviewed PRs while dspack/examples/astryx.dspack.json still carries the 3-intent / 9-component edition, so the take-home view's "byte-synced copy of dspack main" sentence over-claims until P0 lands. No cross-repo commits made; the sync direction is flagged as an owner decision inside P0.
  • Sweep result: no stale planned-scenario, 3-ready/3-planned, or TODO references remain; the planned-entry shelf machinery, unknown-permalink error copy, and Scenario.needs type field are live code kept deliberately.

No code changes; no gates affected.

🤖 Generated with Claude Code

…he platform roadmap

IMPLEMENTATION_LOG gains the permanent close-out record: PRs #16-#20
merged, dspack-gen 0.1.2 published and consumed, final verified state
(6/6 scenarios ready, 12 components / 6 intents / 14 rules / 6 worked
examples, all gates green on main at 7db93d8), and the deliberate
deferrals.

PHASE-NEXT is rewritten from the delivered WS0-WS3 plan into the
platform roadmap: P0 contract re-sync upstream (the byte-sync standing
constraint is currently unmet — this milestone authored governance in
the studio copy through reviewed PRs while dspack/examples still
carries the 3-intent, 9-component edition; the take-home copy's
"byte-synced copy of dspack main" sentence over-claims until the sync
lands), P1 shadcn contract parity, P2 transactional-review
interactivity, P3 generator expressiveness ceilings, P4 dropdown-menu
item vocabulary, P5 search-class components. Standing constraints and
delivery discipline restated unchanged, with the unmet constraint
called out rather than rewritten.

Audit sweep found no other stale planned-scenario or 3-ready/3-planned
references: the shelf's planned-entry code path, the unknown-permalink
error copy, and the Scenario.needs type field are live machinery kept
deliberately; historical log/audit entries describe their own eras.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Copilot AI review requested due to automatic review settings July 22, 2026 01:31
@ryandmonk
ryandmonk merged commit d460d66 into main Jul 22, 2026

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

Closes out the “example-expansion” milestone in documentation by recording the delivered state and rewriting the “Phase Next” document into a forward-looking platform roadmap (P0–P5), explicitly calling out the currently-unmet byte-sync constraint.

Changes:

  • Replaces the prior WS0–WS3 plan in docs/PHASE-NEXT.md with a platform roadmap and restated standing constraints (including the byte-sync mismatch).
  • Adds a milestone close-out entry to docs/IMPLEMENTATION_LOG.md summarizing merged PRs, verified state, gates, and deliberate deferrals.

Reviewed changes

Copilot reviewed 2 out of 2 changed files in this pull request and generated 2 comments.

File Description
docs/PHASE-NEXT.md Rewrites the roadmap into P0–P5, restates constraints, and documents the current byte-sync mismatch as the first roadmap item.
docs/IMPLEMENTATION_LOG.md Adds a close-out record for the example-expansion milestone with final verified inventory, gates, and deferrals.

💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.

Comment thread docs/PHASE-NEXT.md
Comment on lines +32 to +34
- Import isolation: `@a2ui/*` only in `a2ui-ingest` and the renderer
packages' shared helper, `@ag-ui/*` only in `agui-bridge`, design-system
imports only in their own renderer package.
Comment on lines +1068 to +1071
Final verified state on main at 7db93d8: 6 of 6 scenarios ready, none
planned; Astryx contract at 12 components / 6 intents / 14 rules / 6
worked examples; fixtures 001-016 (004 bundled-unreferenced,
pre-existing); every scenario replay/permalink/X-ray/Break-It/Restyle
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants