Skip to content

SLL-700 minor version support#69

Draft
tahliar wants to merge 6 commits into
maintenance/SLL9from
SLL-700-minor-version-support
Draft

SLL-700 minor version support#69
tahliar wants to merge 6 commits into
maintenance/SLL9from
SLL-700-minor-version-support

Conversation

@tahliar

@tahliar tahliar commented Dec 17, 2025

Copy link
Copy Markdown
Collaborator

PR creator: Description

Add EMS to the MLS 9 RMT guide. I've added steps to the main procedures for people who are performing them for the first time, and also an appendix for switching from the standard repos to the EMS repos.

This is a draft for now as the product is still in beta, and I still need to test the new script.

PDF:
art-quickstart_en.pdf

PR creator: Are there any relevant issues/feature requests?

  • Jira Issue #SLL-700

PR creator: Which product versions do the changes apply to?

When opening a PR, check all versions of the documentation that your PR applies to.

  • SUSE Multi-Linux Support next (current main, no backport necessary)
  • SUSE Multi-Linux Support 9
  • SUSE Multi-Linux Support 8
  • SUSE Multi-Linux Support 7

PR reviewer: Checklist

The doc team member merging your PR will take care of the following tasks and will tick the boxes if done.

@tahliar
tahliar force-pushed the SLL-700-minor-version-support branch from a6b337a to 3409c08 Compare May 7, 2026 04:11
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant