Skip to content

Milestones

List view

  • Currently Rackula only has half or full depth conceptually, while racks and devices have a wide range of depths. This is also an important area of planning for racks: often a device could be longer than the full depth of a rack. Therefore we need to get accurate depth visualization.

    No due date
    1/9 issues closed
  • Git-backed bring-your-own storage for layouts (GitHub, Forgejo/Gitea, GitLab, custom), plus a gated device-library-over-git direction. Client-side, complementary to M17 hosted sync.

    No due date
    0/5 issues closed
  • No due date
    0/7 issues closed
  • No due date
    18/30 issues closed
  • No due date
    5/24 issues closed
  • Mobile and touch-specific interactions: touch optimization, long-press gestures, touch-accessible overlays, mobile touch hardening.

    No due date
    25/27 issues closed
  • i18n support: language store with browser detection and persistence, language selector UI. Low priority until non-English users request it.

    No due date
    0/3 issues closed
  • Advanced export capabilities: isometric rendering as a standalone service, DXF/AutoCAD interchange, and embeddable visualisations. High effort; evaluate feasibility before committing.

    No due date
    0/10 issues closed
  • Extensions of M5/M6 connectivity work that depend on the core model shipping first. Includes power distribution and multi-rack E2E testing. Prerequisite: M5 and M6 complete.

    No due date
    1/18 issues closed
  • Export/share stabilization, URL shortener infrastructure, responsive export preview fixes, and share dialog a11y.

    No due date
    0/15 issues closed
  • Device model enrichment (half-width layouts, instance metadata, descending units), image system (coverage, upload UX, discoverability), design audit, and import hardening. Prerequisite for M5/M6 connectivity work.

    No due date
    11/28 issues closed
  • Signal types, gender, patch bay normalling, external endpoints, cable types, patch list export, matrix switcher routing. Refinement beyond the core connectivity workflow.

    No due date
    2/12 issues closed
  • AV port types, direction, port display, connection store, connection rendering, click-to-connect. The 80/20 slice that lets live audio techs place AV devices and draw signal paths between them.

    No due date
    15/17 issues closed
  • Unscheduled / deferred work not in the next 3 sprints. Replaces the retired semver milestone buckets (CalVer decision #1315).

    No due date
    70/80 issues closed
  • Sprint 3 - Developer-friendly data format + ecosystem interoperability foundation. See docs/planning/ROADMAP.md.

    No due date
    39/45 issues closed
  • Sprint 2 - Public community-scripts submission + finish in-flight work + stability. See docs/planning/ROADMAP.md. Closure = in-repo deliverables + #1986 (VPS decommission). Externally gated items (#2142 upstream promotion, #2053 selfh.st icons, #2013 Unraid CA submission) carry the waiting-external label and do not gate closure.

    No due date
    77/79 issues closed