  • Homepage funnel surfaces, Proposals F and G, residue quiz, funnel connective pass, MTG Artist Connection, contributor node, client-side phash, and site documentation links.

    No due date
    5/32 issues closed
  • Scryfall refresh automation, drive/disk management, deployment artifact, container auth, and related backend-ops tasks.

    No due date
    1/6 issues closed
  • Extractable-primitives follow-ups, Proposal I items, and held upstream-* draft branches awaiting owner send.

    No due date
    0/3 issues closed
  • illustration_id as a first-class signal: import (#506), OCR-premise deduction calculator (#507), artbox-phash exemplar matching (#508), and the voting-UI alignment work (#503, #504). Backend pair is dispatched; the rest is unscheduled.

    No due date
    2/6 issues closed
  • The project thesis as a sequenced program with a terminal state: signed verdict export → import path with the FEDERATED gate mode → §8 reference-consumer spec → first peer exchange. It ends when two instances exchange verdicts.

    No due date
    1/6 issues closed
  • Sequenced frontend program for the /display page: pane migration → G-save integration → post-export contribution prompt → Select Version build.

    No due date
    16/39 issues closed
  • Owner-approved phased sequence (2026-07-23, backfill completed BEFORE review surfaces): PHASE 0 — rails: write-observability (self-recording ledger rows for recompute+extraction, counters-before-output), forced-dry-run guard (#362), crash-recovery drill (#153), deduction-weighting decision (owner). PHASE 1 — lands: patch identifier to read stored evidence, then dry-run→write (#359). PHASE 2 — own-hash deduction channel: design pass first, then build (#363). PHASE 3 — corners: proxy-marker compliance scan (#291), source-targeted unreadable-photos re-scan on deferral lift (#360), review-pile cleanup tooling (#361). PHASE 4 — capstone: backfill runbook + streaming/resume machinery (#364) — one resumable documented sequence for fresh instances/new sources. THEN review surfaces: moderator cluster UI (#262) and confirmation-funnel scale-up.

    No due date
    7/28 issues closed
  • Run-readiness gates: dpi=250 parity replay + knowledge-inventory sweep, soak gate, deploy-freeze protocol, ramp/concurrency probes, drive-health rollup.

    No due date
    4/6 issues closed
  • Stage D calculators (D1-D6, behind the fidelity gate) and Stage E streaming assembly + resume contract + kill-test. Status (2026-07-22): Stage D calculators built + run in production, verified reconciled (#152, #258, #273); fidelity gate #154 ("blocks Stage D and any full-catalog fire") still open despite that; Stage E not started (#153).

    No due date
    13/25 issues closed
  • Manifest extractors against the Stage C substrate (ImageEvidence + golden set). One PR per extractor, golden-set-tested before merge.

    No due date
    9/10 issues closed
  • Housekeeping and owner-decision items from the 2026-07-19 reconciliation sweep (docs/reports/2026-07-19-reconciliation-sweep.md).

    No due date
    3/16 issues closed