Techno-economic modeling of a natural-gas-powered data center energy system

Overview

This repository contains our technical and techno-economic analysis for the AMTS Energython Africa 2026 challenge.

The project approaches the challenge as an integrated physical system + operational + financial model, rather than treating the power plant as a simple financial asset.

Our modeling pipeline is:

Natural Gas (CNG virtual pipeline)
     │
     ▼
2x Gas Turbines (Kawasaki GPB80D)
     │
     ├──────────────────────► Electricity (15.34 MWe)
     │                              │
     │                              ▼
     │                       Data Center (facility load)
     ▼
   Exhaust (526°C)
     │
     ▼
    HRSG (steam 34 t/h @ 3.8 MPa)
     │
     ▼
   Steam Turbine (Siemens SST-200)
     │
     ├──────────────────────► Electricity (4.72 MWe)
     │                              │
     │                              ▼
     │                    Data Center / Grid export
     ▼
   Surplus to TCN 33 kV Grid (grid-tied export)
          ↓
   Operational Model (dispatch / availability)
          ↓
     PPA Revenue
          ↓
   CAPEX + OPEX
          ↓
   Project Cash Flows
          ↓
       NPV / IRR

The objective is to determine whether a natural-gas-based combined-cycle generation system can provide reliable, economically competitive and technically viable power for a large data-center load. Waste heat is converted into additional electricity via a steam bottoming cycle (CCGT) — not into cooling. Data-center cooling electricity is represented directly through the facility's PUE (1.25 tropical target).


Core Questions

The model is designed to answer:

  • What generation configuration is technically appropriate for a 10–20 MW data center?
  • How much natural gas is required (CNG truck-delivered)?
  • How does combined-cycle efficiency change with load?
  • How much electricity does the steam bottoming cycle add from turbine exhaust?
  • What N+1 reliability does the 2x1 GT+ST configuration provide?
  • How do planned and forced outages affect delivered energy?
  • What are the CAPEX and OPEX requirements?
  • How should the PPA structure electricity and capacity revenue?
  • How does grid-tied export of surplus generation contribute to revenue?
  • What are the project's NPV and IRR?
  • Which assumptions have the greatest effect on project viability?
  • What operating and system configuration maximizes project value?

Modeling Architecture

The project is divided into several interconnected layers.

1. Physical Model

Models the CCGT generation system.

Key variables include:

  • Gas turbine capacity and simple-cycle efficiency (heat rate)
  • Combined-cycle configuration (2x GT + 1x ST via HRSG)
  • Fuel consumption (CNG, Nm³/h and kg/h)
  • Tesla exhaust temperature and mass flow
  • HRSG steam yield and steam-turbine output
  • Load
  • Grid export

2. Operational Model

Determines how the plant operates under changing conditions.

This includes:

  • GT/ST dispatch
  • Part-load operation
  • Engine availability
  • Planned maintenance
  • Forced outages
  • N+1 redundancy (2x GT + 1x ST)
  • Grid backup
  • Reserve capacity
  • CNG fuel-supply reliability

3. Revenue Model

Translates physical output into project revenue.

Revenue streams:

  • Energy payments (data center + grid export)
  • Capacity payments
  • Grid export of surplus power

4. Financial Model

Models:

  • CAPEX
  • Fuel costs
  • Maintenance
  • Other OPEX
  • Financing
  • Debt service
  • Taxes
  • Project cash flow
  • Equity cash flow
  • NPV
  • IRR

5. Sensitivity & Optimization

Tests how project viability changes under different assumptions.

Examples:

  • Natural-gas price (CNG delivered $/MMBtu)
  • Electricity/PPA price
  • Combined-cycle efficiency
  • Engine configuration
  • CAPEX
  • Availability
  • Financing conditions
  • Load profile scenario (mixed / AI-heavy / cloud-heavy)

Repository Structure

spe-energython/
│
├── README.md
├── LICENSE
├── CONTRIBUTING.md
├── requirements.txt
│
├── research/
│   ├── engineering_checkpoints.md        # resolved engineering decisions (CLOSED)
│   ├── literature_review.md
│   ├── sources.md
│   └── technical-team-research/          # consolidated design research (CS#1)
│       ├── research/                     # merged markdown docs 00–08
│       ├── assets/                       # datasheets, images, plant layout
│       └── archive/
│
├── docs/
│   ├── 01_challenge.md
│   ├── 02_system_architecture.md
│   ├── 03_modeling_methodology.md
│   ├── 04_assumptions.md
│   ├── 05_validation.md
│   └── cs1_data_center/                  # CS#1 specs: sizing, PUE, load profiling
│
├── data/
│   ├── load_profiles/                    # 8760-hr CSVs (3 scenarios x 3 phases)
│   ├── config/parameters.yaml            # CS#1 data center config
│   └── README.md
│
├── models/
│   ├── physical/
│   │   ├── engine.py
│   │   ├── fuel.py
│   │   ├── heat_recovery.py
│   │   ├── combined_cycle.py
│   │   └── plant.py
│   │
│   ├── operational/
│   │   ├── dispatch.py
│   │   ├── reliability.py
│   │   ├── availability.py
│   │   └── maintenance.py
│   │
│   └── financial/
│       ├── revenue.py
│       ├── opex.py
│       ├── capex.py
│       ├── financing.py
│       ├── cashflow.py
│       └── returns.py
│
├── scenarios/
│   ├── baselines.yaml                    # CANONICAL — locked engineering + working financials
│   ├── high_gas_price.yaml
│   ├── low_gas_price.yaml
│   └── sensitivity.yaml
│
├── analysis/
│   ├── sensitivity.py
│   ├── optimization.py
│   └── results.py
│
├── notebooks/
│   ├── 01_physical_model.ipynb
│   ├── 02_dispatch_model.ipynb
│   ├── 03_financial_model.ipynb
│   └── 04_sensitivity_analysis.ipynb
│
├── outputs/
│   ├── figures/
│   ├── tables/
│   └── reports/
│
└── tests/

Research Status

🚧 Research phase CLOSED — moving to model build.

The engineering configuration is locked:

  • 2x1 CCGT: 2x Kawasaki GPB80D gas turbines (15.34 MWe) + 1x Siemens SST-200 condensing steam turbine (4.72 MWe) = 20.06 MWe gross / ~19.60 MWe net
  • Combined-cycle efficiency: 43.5–45.0%
  • Fuel: CNG truck-delivered "virtual pipeline", ~4,623 Nm³/h (~157 MMBtu/h)
  • Electrical: 6.6 kV generation → 2x 15 MVA transformers → TCN 33 kV, grid-tied
  • Data center: 10–20 MW (CS#1 8760-hr load profiles), PUE 1.25 tropical

See research/technical-team-research/research/ for the full consolidated design record, and scenarios/baselines.yaml for the canonical model parameter file.


Assumptions

Assumptions are not hard-coded into model logic — they are stored in scenarios/*.yaml.

The canonical baseline is scenarios/baselines.yaml. Key values:

plant:
  gas_turbine_count: 2
  gas_turbine_capacity_mw: 7.67
  steam_turbine_capacity_mw: 4.72
  net_capacity_mw: 19.60
  combined_cycle_efficiency: 0.44

engine:
  availability: 0.95

fuel:
  price_usd_per_mmbtu: 8.0        # WORKING — delivered CNG

data_center:
  baseline_load_profile: "mixed"
  target_pue: 1.25

ppa:
  energy_price_usd_per_kwh: 0.15  # WORKING
  capacity_payment_usd_per_month: 20000  # WORKING

Engineering values are locked from research. Financial values ($/MMBtu gas, PPA pricing, financing terms) are marked WORKING — they seed the build and are sensitivity-swept, since the research phase has closed.


Key Engineering Relationships

Electrical generation (CCGT)

[ E_{electric}=P_{electric}\times t ]

Fuel requirement

[ E_{fuel}=\frac{E_{electric}}{\eta_{cc}} ]

where combined-cycle efficiency [ \eta_{cc}\approx 0.435\text{--}0.45 ]

Gas turbine exhaust → HRSG steam

[ \dot m_{steam}=f(\dot m_{exhaust},T_{exhaust}) ]

Steam turbine output (bottoming cycle)

[ P_{ST}=\dot m_{steam}\times \Delta h \times \eta_{Rankine} ]

Grid export

[ E_{export}=E_{generated}-E_{data\ center\ load} ]

Gas cost

[ Gas\ Cost=Gas\ Consumption\times Gas\ Price ]

Energy revenue

[ Energy\ Revenue=E_{delivered}\times P_{energy} ]

Present value

[ PV_t=\frac{CF_t}{(1+r)^t} ]

Project NPV

[ NPV=-CAPEX+\sum_{t=1}^{T}\frac{CF_t}{(1+r)^t} ]


Model Development Principles

1. Physics before finance

Financial outputs are downstream of the physical system:

What does the plant physically do? → How does it operate? → What does that operation cost and produce? → Is the resulting project financially viable?

2. Separate assumptions from model logic

Technical assumptions are configurable via scenarios/*.yaml, not embedded in Python.

3. Make assumptions traceable

Every major parameter should have: value, unit, source, rationale, confidence level. (Engineering values are locked and sourced; financial values are WORKING.)

4. Validate before optimizing

Ensure physical and financial models behave correctly before attempting optimization.

5. Test edge cases

Examples: full load, part load, GT outage, HRSG/ST trip, maintenance periods, gas-supply interruption, grid export/import, high/low gas prices, high/low electricity prices.


Reproducibility

git clone <repository-url>
cd spe-energython

pip install -r requirements.txt

python -m models.physical.plant --scenario baselines
python -m analysis.results --scenario baselines

Exact commands will be updated as the implementation stabilizes.


Disclaimer

This repository is an analytical and modeling project developed for the AMTS Energython Africa 2026 challenge. Financial parameters are working assumptions for a competition submission and should not be interpreted as engineering, financial, or investment advice.

About

Research Notes from the SPE AMTS Energython 2026

Topics

Resources

Contributing

Stars

2 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages