plan: SHIP Phase 3 — PLAN.md, gate riders, G4 archive moves#57
Merged
Conversation
G1a: literal entry counts removed from acceptance criteria (D3 references the E6 generated figure). G6a: the receipt never encodes status by color alone — icon + word + color, correct in grayscale (WCAG 1.4.1) — pinned in D1 and DESIGN $1. G6b: D11's Arabic face pick + measured subset size becomes a PLAN.md checkpoint before implementation. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01LVPyHAtQ1cdK76RpFasafP
…(G4) E3 first: the stale 'Plan only — no feature code written' footer is replaced with the executed-status record (Slices A-E merged, broker retired, Path A=0 CI-gated) BEFORE the move, per the SHIP-GATE-R2 rider. Then git mv: PLAN.md -> docs/archive/PLAN-goose-pivot.md, AUDIT.md -> docs/archive/AUDIT-goose-pivot.md, and the Phase-1 ship audit promoted audit/AUDIT.md -> AUDIT.md. All five in-repo references updated in the same change: ROADMAP.md:80, docs/OPERATOR-RUNBOOK.md:119,129,136 (the :136 reference is one beyond the ruling's enumerated set — same pattern, included for completeness), and the comment-only src/lib/goose-deeplink.ts:8. docs/CONTEXT-MANIFEST.md does not exist in this repo (verified) — nothing to update there. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01LVPyHAtQ1cdK76RpFasafP
… (Phase 3) The approved scope (BACKLOG SHIP column) ordered into nine vertical slices: governance truth first (M0 — the P0, with the gate mechanism named and the B4 required-check dependency stated plainly), then system layer -> receipts on the trust surfaces -> catalog density -> island tokenization -> landing/ register -> console+Arabic-face+hydration (with the G6b pre-implementation checkpoint) -> doc closeout -> the two-pass verification loop and SHIP.md. Includes the full DoD reconciliation per SHIP-GATE-R1 2d: G3's path-named enforcement criterion and the Pages->Workers deploy reality verified at SHIP-GATE-R2 item 0. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01LVPyHAtQ1cdK76RpFasafP
Deploying with
|
| Status | Name | Latest Commit | Updated (UTC) |
|---|---|---|---|
| ✅ Deployment successful! View logs |
wecanjustbuildthings | 3d8fa85 | Jul 11 2026, 09:59 AM |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What does this PR do?
The SHIP-GATE-R2-authorized Phase-3 package — three commits, one logical change each:
9c5a1ab— riders folded into acceptance criteria: G1a (no literal entry counts — D3 references the E6 generated figure), G6a (receipt status never encoded by color alone; icon + word + color, grayscale-correct, WCAG 1.4.1 — pinned in D1 and DESIGN §1), G6b (D11's Arabic-face pick + measured subset size = recorded PLAN.md checkpoint before implementation).13848b8— G4 executed: E3's truthful footer lands on the old PLAN.md BEFORE the move (executed-status record replaces "no feature code written"); thengit mvPLAN.md/AUDIT.md →docs/archive/{PLAN,AUDIT}-goose-pivot.md; the Phase-1 ship audit promotedaudit/AUDIT.md→AUDIT.md. All in-repo references updated in the same change:ROADMAP.md:80,docs/OPERATOR-RUNBOOK.md:119,129and:136(one beyond the ruling's enumerated set — same pattern, included for completeness), and the comment-onlysrc/lib/goose-deeplink.ts:8.docs/CONTEXT-MANIFEST.mdverified nonexistent — nothing to update.3d8fa85— PLAN.md: milestones M0–M8 as vertical slices with per-item acceptance criteria and non-goals. M0 is the P0 (governance truth) and names the gate mechanism — additivei18n-security-gate.ymlonpull_request+pull_request_review, path-mapped tosecurity_sensitivesources and their locale variants, failing while distinct approvals < 2 — with the B4 dependency stated plainly: until the check is marked required (OWNER), the gate is a loud advisory, not a block. Full DoD reconciliation per 2d, including G3's path-named enforcement criterion and the Pages→Workers deploy reality verified at item 0.E10 also executed under its Rule-9 approval:
LOOP.mddeleted (untracked working file — no diff line; B7 items were already harvested into BACKLOG.md).SHIP-GATE-R2 item 0 — finding (also echoed in session)
The merge gate is real. Deployments ledger (read-only
wrangler deployments listvsversions list, 2026-07-11): production deployments today are exactly four — 06:45, 07:46, 07:59, 09:37 UTC — one per merge (#53–#56). The four branch-push builds (06:31, 06:55, 07:49, and 09:24 =d78fc97) exist only as uploaded versions — previews, zero traffic. The bot's "Deployment successful" wording and/production/URL path are cosmetic (the Builds UI nests all builds under the environment path). No dashboard fix needed.Verification
npm run verify:allgreen after the moves (astro check 0 errors; 352/352 tests; enforce + build complete) — thegoose-deeplink.tscomment edit and archive moves break nothingPLAN.md §5references (grep clean)On merge: implementation starts at M0 in milestone-sized PRs,
verify:all+ enforce green before each closes, no further gates except Rule 9.🤖 Generated with Claude Code
https://claude.ai/code/session_01LVPyHAtQ1cdK76RpFasafP
Generated by Claude Code