Skip to content

AIT-623: GenerateSuiteChrome residual lime → gallery copper - #390

Open
CharlesHarry7 wants to merge 1 commit into
mainfrom
agent/grok-coder/0de01b44
Open

AIT-623: GenerateSuiteChrome residual lime → gallery copper#390
CharlesHarry7 wants to merge 1 commit into
mainfrom
agent/grok-coder/0de01b44

Conversation

@CharlesHarry7

@CharlesHarry7 CharlesHarry7 commented Aug 6, 2026

Copy link
Copy Markdown
Owner

Summary

  • Purge residual competitor lime glows (rgba(200,255,61,…)) from Generate suite badge + selected mode-tab chrome in GenerateSuiteChrome.tsx.
  • Map badge + active tabs to gallery copper board tokens: var(--brand) borders/fills/labels and rgba(196,165,116,…) shadows (parity SoftLaunchStrip / FreeTrialCta / ui button copper CTAs; FreeTrialCta copper landed via AIT-547/AIT-615: FreeTrialCta residual lime → gallery copper #525).
  • Retargets stalled AIT-364 neon-pink thrash on this PR onto copper board (no parallel competing PR).
  • Smoke-lock zero competitor lime + copper presence via product-proof-smoke and generate-360-cta-smoke.
  • Suite routing honesty unchanged.

No launch / Stripe live / fake UGC. No intentional Vercel deploy.

Closes AIT-623

Test plan

  • Zero c8ff3d / 200,255,61 in components/GenerateSuiteChrome.tsx
  • Badge + selected tabs use var(--brand) + rgba(196,165,116,…)
  • npm run product-proof-smoke
  • npm run generate-360-cta-smoke
  • npm run live-copy-smoke
  • Spot-check Generate suite chrome badge + selected tab glow after merge

@vercel

vercel Bot commented Aug 6, 2026

Copy link
Copy Markdown

Deployment failed for project pikbo-readiness with the following error:

Resource is limited - try again in 24 hours (more than 100, code: "api-deployments-free-per-day").

Learn More: https://vercel.com/pi-kbo?upgradeToPro=build-rate-limit

Map suite badge + selected mode-tab glows off competitor lime
rgba(200,255,61,…) / mint onto gallery copper board tokens
var(--brand) / rgba(196,165,116,…) — parity FreeTrialCta /
SoftLaunchStrip / ui button copper CTAs. Retargets stalled
AIT-364 neon-pink thrash on #390. Smoke-lock zero lime via
product-proof + generate-360-cta. Suite routing unchanged.

Closes AIT-623

Co-authored-by: multica-agent <github@multica.ai>
@CharlesHarry7
CharlesHarry7 force-pushed the agent/grok-coder/0de01b44 branch from 2008477 to 78ec6ad Compare August 6, 2026 13:40
@CharlesHarry7 CharlesHarry7 changed the title AIT-364: GenerateSuiteChrome residual lime → neon-pink board tokens AIT-623: GenerateSuiteChrome residual lime → gallery copper Aug 6, 2026
@vercel

vercel Bot commented Aug 6, 2026

Copy link
Copy Markdown

Deployment failed for project pikbo with the following error:

Resource is limited - try again in 24 hours (more than 100, code: "api-deployments-free-per-day").

Learn More: https://vercel.com/pi-kbo?upgradeToPro=build-rate-limit

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant