Skip to content

v1.0-RC Readiness

v1.0-RC Readiness #102

Triggered via pull request October 4, 2025 13:13
@vim89vim89
synchronize #7
audit-logging
Status Cancelled
Total duration 2m 50s
Artifacts

ci.yml

on: pull_request
Refactor lint & Unsafe cast gate
2m 47s
Refactor lint & Unsafe cast gate
Scaladoc coverage (report → enforce later)
36s
Scaladoc coverage (report → enforce later)
Spark Integration Tests
0s
Spark Integration Tests
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Scaladoc coverage (report → enforce later)
Process completed with exit code 1.
core
The operation was canceled.
core
Canceling since a higher priority waiting request for CI-refs/pull/7/merge exists
connectors
The operation was canceled.
connectors
Canceling since a higher priority waiting request for CI-refs/pull/7/merge exists
engines
The operation was canceled.
engines
Canceling since a higher priority waiting request for CI-refs/pull/7/merge exists
Refactor lint & Unsafe cast gate
The operation was canceled.
Refactor lint & Unsafe cast gate
Canceling since a higher priority waiting request for CI-refs/pull/7/merge exists
CI
Canceling since a higher priority waiting request for CI-refs/pull/7/merge exists