Skip to content

v1.0-RC Readiness

v1.0-RC Readiness #101

Triggered via pull request October 3, 2025 05:52
@vim89vim89
synchronize #7
audit-logging
Status Cancelled
Total duration 35s
Artifacts

ci.yml

on: pull_request
Refactor lint & Unsafe cast gate
31s
Refactor lint & Unsafe cast gate
Scaladoc coverage (report → enforce later)
22s
Scaladoc coverage (report → enforce later)
spark-it
0s
spark-it
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Scaladoc coverage (report → enforce later)
The operation was canceled.
Scaladoc coverage (report → enforce later)
The run was canceled by @vim89.
engines
The operation was canceled.
engines
The run was canceled by @vim89.
connectors
The operation was canceled.
connectors
The run was canceled by @vim89.
core
The operation was canceled.
core
The run was canceled by @vim89.
Refactor lint & Unsafe cast gate
The operation was canceled.
Refactor lint & Unsafe cast gate
The run was canceled by @vim89.
CI
The run was canceled by @vim89.