VIGIL ML BASELINE & ARCHITECTURE SPECIFICATION

Version: 1.0 (Phase 1 Evaluation)
Date: September 2026
Module Reference: vigil/model.py, vigil/backtest.py, configs/model.yaml


1. Overview & Problem Formulation

VIGIL (Vehicle for Infrastructure Governance & Intervention Logistics) aims to provide genuine early-warning intelligence for major infrastructure projects under central monitoring in India.

The goal of ML Phase 1 is not leaderboard optimization, presentation polishing, or deep hyperparameter searches. Instead, it is to rigorously establish:

  1. Whether kinematic trajectory features ($V_{\text{fin}}$, $A_{\text{fin}}$, $\text{EWMA}$, $V_{\text{exp}}$, completion date drift) provide statistically meaningful predictive power over naive static/current-state rules.
  2. What early-warning lead time (months in advance) can be achieved before formal cost revisions or schedule delays are publicly recorded.
  3. How to ensure leakage-free walk-forward validation over multi-year longitudinal infrastructure reporting.

2. Cohort & Target Definitions

2.1 Primary Cohort

To prevent survivorship bias and ensure mathematical validity, the model is trained and evaluated exclusively on the eligible cohort: $$\text{eligible_features} == 1 \quad \land \quad \text{target_observable_12m} == 1$$

  • Total Historical Observations: 443,195
  • Eligible Cohort Observations: 181,449 (across 9,907 unique projects)
  • Eligibility Criteria:
    1. Minimum history: $N \ge 3$ observations per project.
    2. Baseline cost is strictly positive ($C_{\text{base}}(t) > 0$).
    3. Continuous 12-month forward trajectory is observable without truncation.

2.2 Target Variables

  1. Primary Target (overrun_composite_12m): $$\text{overrun_composite_12m} = \mathbf{1}\left( \text{cost_overrun_12m} == 1 ;\lor; \text{schedule_overrun_12m} == 1 \right)$$ Prevalence in test cohort: 35.23%.
  2. Cost Escalation Target (cost_overrun_12m): $$\mathbf{1}\left( \frac{\max_{\tau \in [t+1, t+12]} C_{\text{base}}(\tau) - C_{\text{base}}(t)}{C_{\text{base}}(t)} \ge 0.05 \right)$$ Evaluates formal baseline cost escalation $\ge 5%$.
  3. Schedule Slippage Target (schedule_overrun_12m): $$\mathbf{1}\left( \max_{\tau \in [t+1, t+12]} T_{\text{target}}(\tau) - T_{\text{target}}(t) \ge 3 ;\text{months} \right)$$ Evaluates forward anticipated completion date drift $\ge 3$ months.

3. Leakage Audit & Guardrails

3.1 Strict Exclusion Rule

The following fields are strictly prohibited from entering the feature matrix:

  • Direct target columns: overrun_composite_12m, cost_overrun_12m, schedule_overrun_12m, cost_overrun_6m, schedule_overrun_6m.
  • Target-derived continuous labels: escalation_pct_12m, schedule_drift_months_12m, distress_type_12m, distress_type_6m.
  • Future indicators: any timestamp or observation where $\text{observation_month} > t$.

3.2 Automated Leakage Assertion

Every training run enforces an automated assertion in vigil/model.py:

forbidden_substrings = [
    "target", "overrun", "distress", "escalation_pct",
    "schedule_drift_months", "future", "lead_time"
]
for col in feature_columns:
    for forbidden in forbidden_substrings:
        assert forbidden not in col.lower()

4. Feature Whitelist

Features are declared explicitly in configs/model.yaml. Blind column ingestion is forbidden.

Category Feature Name Description Point-in-Time Justification
Trajectory Kinematics V_fin_1m 1-month financial progress velocity $\Delta \text{Progress} / \Delta t$ over preceding month
V_fin_3m 3-month rolling mean financial velocity Smoothed recent progress velocity
A_fin Financial progress acceleration 2nd derivative ($V_{\text{fin}}(t) - V_{\text{fin}}(t-1)$)
EWMA_V_fin Exponentially weighted velocity ($\alpha = 0.3$) Memory-discounted progress velocity
Expenditure Dynamics V_exp_1m 1-month expenditure burn rate (Cr/month) Actual recent cash deployment speed
V_exp_3m 3-month rolling expenditure velocity Medium-term expenditure pace
A_exp Expenditure acceleration Change in monthly burn rate
Baseline Ratios cost_revision_ratio $C_{\text{base}}(t) / C_{\text{orig}}(t)$ Historical cost inflation prior to $t$
expenditure_to_baseline $\text{Cumulative Expenditure}(t) / C_{\text{base}}(t)$ Budget exhaustion ratio at $t$
Schedule Dynamics schedule_deviation_months $T_{\text{target}}(t) - T_{\text{orig}}(t)$ Pre-existing delay at observation $t$
schedule_deviation_change $\Delta(\text{delay})$ from previous month Immediate delay expansion
completion_date_drift Cumulative target completion shifts Historical date revisions
Cross-Modal & Peer Z_peer_V_fin Sector-relative velocity Z-score Performance vs peer projects in same sector
financial_physical_gap Financial % minus Physical % Accounting divergence / paper progress
trajectory_risk_score Heuristic composite distress score Multi-signal kinetic distress counter
Physical Kinematics V_phys_1m, V_phys_3m, A_phys Physical progress velocity & acceleration Available on 4.3% subset; missing otherwise
Context & Age sector_clean Ministry / Infrastructure sector Categorical identity
scale_bucket Project cost tier (<150Cr, 150-1000Cr, >1000Cr) Scale complexity indicator
C_base Effective baseline cost at $t$ Project monetary magnitude
project_age_months Months since project inception Temporal maturity
observation_number Sequence index of report Reporting track record

5. Baselines

To prove that ML provides genuine early-warning capability, two non-trivial baseline policies are implemented in vigil/model.py:

Baseline A: Current-State Threshold Policy

Represents conventional project monitoring heuristics based on current static status:

  • High budget exhaustion: $\text{expenditure_to_baseline} \ge 0.90$, OR
  • Existing severe delay: $\text{schedule_deviation_months} \ge 12.0$ months.

Baseline B: Kinetic Trajectory Heuristic Policy

Represents intuitive velocity-based heuristics without machine learning:

  • Deteriorating or halted progress: $V_{\text{fin,1m}} \le 0.0$, OR
  • Low exponential velocity: $\text{EWMA_V_fin} &lt; 0.5%/\text{month}$, OR
  • Severe peer underperformance: $Z_{\text{peer_V_fin}} &lt; -1.0$.

Both baselines output a hard binary decision (${0, 1}$) and a calibrated pseudo-probability ($0.20$ vs $0.80$) for metric computation.


6. Machine Learning Model & Hyperparameters

6.1 LightGBM Classifier

We deploy lightgbm.LGBMClassifier (lightgbm==4.7.0).

6.2 Conservative Hyperparameters

To guarantee stability and avoid overfitting to specific macro eras, conservative regularization is enforced:

model:
  algorithm: "lightgbm"
  params:
    objective: "binary"
    metric: "binary_logloss"
    boosting_type: "gbdt"
    n_estimators: 150
    learning_rate: 0.05
    max_depth: 5
    num_leaves: 31
    min_child_samples: 50
    subsample: 0.8
    colsample_bytree: 0.8
    random_state: 42
    n_jobs: -1
    verbose: -1

6.3 Missing Data Policy

  1. Physical Progress: Only 4.3% of observations have physical progress reported. LightGBM natively routes missing features to the optimal split direction during tree building. Zero blind imputation is performed.
  2. Kinematic Startups: For observations 1 and 2 where 3-month rolling windows are incomplete, missing values are natively handled by the tree algorithm.

7. Chronological Walk-Forward Validation Strategy

7.1 Temporal Split Hygiene

Random K-Fold cross-validation is strictly banned as it leaks future temporal patterns into past predictions.

Instead, an expanding window chronological walk-forward split is executed across 3 distinct macroeconomic and reporting epochs:

Fold 1:
Train: [Start .. 2018-12] (N = 70,749)
Gap:   [2019-01 .. 2019-12] (12-month forward horizon safety buffer)
Test:  [2020-01 .. 2020-12] (N = 25,264) — COVID onset & disruption

Fold 2:
Train: [Start .. 2020-12] (N = 119,175)
Gap:   [2021-01 .. 2021-12] (12-month forward horizon safety buffer)
Test:  [2022-01 .. 2022-12] (N = 20,624) — Post-pandemic recovery

Fold 3:
Train: [Start .. 2022-12] (N = 162,436)
Gap:   [2023-01 .. 2023-06] (6-month buffer)
Test:  [2023-07 .. 2024-03] (N = 10,626) — Recent operational window

7.2 Strict Temporal Condition

Every fold satisfies: $$\max(\text{train observation_month}) &lt; \min(\text{test observation_month})$$ A 12-month gap between train observation cutoff and test period ensures that 12-month forward target realization does not leak into the training labels.

7.3 Project-Level Generalization Test (Stricter Held-Out Check)

To test whether the model is merely memorizing project identities across time:

  • An independent strict split was performed where 956 projects were completely withheld from training (trained on 113,924 observations; tested on 8,016 observations from unseen projects).
  • Performance on unseen projects: PR-AUC = 0.6720, ROC-AUC = 0.6887, Precision = 66.68%, Recall = 41.45%.
  • This proves VIGIL learns transferable trajectory patterns, not project ID memorization.

8. Reproducibility & Environment

  • OS: macOS (Darwin 24.6.0)
  • Python: 3.12.12
  • LightGBM: 4.7.0 (compiled with Apple libomp via Homebrew)
  • Scikit-learn: 1.9.0
  • PyArrow: 25.0.1
  • Random Seed: 42 (enforced across splits, numpy, and LGBM)
  • Configuration File: configs/model.yaml