The scheduled trunk-health check measured 1/8 failed CI runs on main (12%), over the configured threshold.
While this issue is open, the andon gate in pr-policy holds merges on every PR except those labeled hotfix-cleared, so regressions stop compounding on an already-red main.
This issue closes automatically on the next scheduled check once the red-rate is back under threshold; run the Trunk Health SLO workflow manually for an immediate re-check after landing the fix.
The scheduled trunk-health check measured 1/8 failed CI runs on main (12%), over the configured threshold.
While this issue is open, the andon gate in pr-policy holds merges on every PR except those labeled
hotfix-cleared, so regressions stop compounding on an already-red main.This issue closes automatically on the next scheduled check once the red-rate is back under threshold; run the Trunk Health SLO workflow manually for an immediate re-check after landing the fix.