Pipeline Gates

Hard checkpoints in the sprint pipeline. Each gate must pass before proceeding. Gates are enforced by the ORCHESTRATOR. The operator can override with explicit approval.


Gate Overview

WAVE 0                    WAVE 1-3              WAVE 4-5              WAVE 6
│                         │                     │                     │
├─ GATE 0: Plan Approved  ├─ GATE 2: Wave N+1   ├─ GATE 4: Merge     ├─ GATE 5: Close
├─ GATE 1: Pre-Dispatch   │  Transition          │  Readiness          │  Sprint
│                         ├─ GATE 3: Agent       │                     │
│                         │  Completion          │                     │

GATE 0: Plan Approved

When: After ORCHESTRATOR presents sprint proposal (Phase 5) Who checks: Operator Blocks: Document generation (Phases 6-8)

Check Required
Sprint goal is clear and scoped YES
Chain count matches the scope (not too many, not too few) YES
Agent count matches the work YES
Wave dependencies are correct YES
Success criteria are measurable (pass/fail, not vague) YES
Risk assessment addresses high-risk chains YES
Operator has explicitly approved YES

If gate fails: ORCHESTRATOR adjusts proposal per operator feedback. Re-present.


GATE 1: Pre-Dispatch

When: After ORCHESTRATOR generates all documents (Phase 8.5) Who checks: ORCHESTRATOR (verified by operator) Blocks: Agent dispatch (pasting prompts into terminals)

Required Files

File Exists?
sprint-XX/codebase-analysis.md [ ]
sprint-XX/DISPATCH.md [ ]
sprint-XX/agent-[X]-[domain].md (one per dispatched agent) [ ]
Activation prompts (one per agent) [ ]

DISPATCH.md Completeness

Section Complete?
Sprint goals [ ]
Codebase conventions (build/test/lint commands) [ ]
All execution traces with vectors, signals, fixes, verification [ ]
Territory map (every directory assigned to one agent) [ ]
Wave assignments (agents to waves) [ ]
Merge order [ ]
Success criteria (measurable) [ ]
Worktree setup script [ ]

Per-Agent Doc Completeness (check every doc)

Section Complete?
Role description with cross-agent context [ ]
Context reading list (numbered, with reasons) [ ]
Files owned (explicit paths) [ ]
Tasks with IDs, current state, required changes, key details [ ]
Wave organization [ ]
Territory with agent attribution on every "DO NOT touch" [ ]
Verification checklist with exact commands + expected output [ ]
Commit strategy [ ]
Completion instructions [ ]

Activation Prompt Completeness (check every prompt)

Part Complete?
Part 1: Identity (codename, branch, working directory) [ ]
Part 2: Context reading list [ ]
Part 3: Domain + cross-agent context [ ]
Part 4: Task summary + chains with traces [ ]
Part 5: Territory (CAN/DO NOT) [ ]
Part 6: Execution protocol + style blocks [ ]
Part 7: Completion requirements [ ]
Intensity protocol appended [ ]
Optimal path appended [ ]
Mesh mode trigger included [ ]

Environment

Check Ready?
Git worktrees created (one per agent) [ ]
Dependencies installed in each worktree [ ]
Terminals open (one per agent) [ ]
Each terminal in correct worktree directory [ ]
Status board created [ ]

If gate fails: Identify which file or section is missing. Go back to the appropriate phase and complete it. Do not dispatch with incomplete documents.


GATE 2: Wave Transition

When: Before starting Wave N+1 Who checks: ORCHESTRATOR + operator Blocks: Next wave dispatch

Check Required
ALL Wave N agents have status COMPLETE or FAILED YES
ALL Wave N completion reports exist YES
Build passes on each Wave N agent's branch YES
No unresolved P0 discoveries from Wave N YES
Operator has acknowledged Wave N results YES

Additional checks for specific transitions:

Wave 1 → Wave 2:

Check Required
DATA's migrations are complete and tested YES (if DATA dispatched)
INFRA's build pipeline works YES (if INFRA dispatched)
DESIGN's tokens/specs are defined YES (if DESIGN dispatched)

Wave 2 → Wave 3:

Check Required
BACKEND API endpoints exist and respond YES (if BACKEND dispatched)
SERVICES integrations work YES (if SERVICES dispatched)

Wave 3 → Wave 4:

Check Required
All coding agents (Waves 1-3) are COMPLETE YES
All branches have been pushed and are ready for review YES

Wave 4 → Wave 5:

Check Required
RED TEAM findings report exists YES
CRITICAL findings are documented YES
ORCHESTRATOR has reviewed RED TEAM findings YES

If gate fails: Do NOT dispatch next wave. Diagnose the blocker:

  • Agent FAILED → operator decides: retry, reassign, or skip
  • P0 discovered → route to appropriate agent or park for next sprint
  • Completion report missing → agent isn't done, wait

GATE 3: Agent Completion

When: An agent claims to be done Who checks: ORCHESTRATOR Blocks: Agent status changing to COMPLETE

Check Required
Completion report exists (sprint-XX/agent-[X]-completion.md) YES
All P1 chains claimed as complete YES
Build passes on the agent's branch YES
Tests pass on the agent's branch YES
Verification commands in task doc produce expected output YES
Only files in "Files Owned" were modified (git diff --name-only) YES
No unresolved P0 discoveries (documented, not necessarily fixed) YES

If gate fails:

  • Completion report missing → agent isn't done
  • Build/test failure → agent must fix before being marked COMPLETE
  • Territory violation → agent must revert unauthorized changes
  • P1 chain incomplete → agent must finish or document why it's parked

GATE 4: Merge Readiness

When: Before LEAD begins merging Who checks: ORCHESTRATOR (provides recommendation to LEAD) Blocks: Merge sequence start

Check Required
ALL coding agents (Waves 1-3) are COMPLETE YES
RED TEAM findings report exists and has been reviewed YES
No unresolved CRITICAL RED TEAM findings YES
HIGH findings either resolved or accepted with documented risk YES
ORCHESTRATOR has produced merge recommendation YES
Merge order matches DISPATCH.md (or documented adjustment) YES
Operator has approved merge start YES

Per-branch merge check (LEAD runs this for each branch):

Check Required
Branch is up to date with its base YES
Build passes on the branch YES
Tests pass on the branch YES
ORCHESTRATOR grade is PASS or PARTIAL (not FAIL) YES
No CRITICAL RED TEAM findings on this branch YES

If gate fails:

  • CRITICAL finding unresolved → that branch does NOT merge
  • Agent grade FAIL → that branch does NOT merge without operator override
  • Build/test failure → agent must fix before merge

GATE 5: Sprint Close

When: After LEAD merges and ships Who checks: ORCHESTRATOR Blocks: Sprint being marked as COMPLETE

Check Required
LEAD's sprint summary exists YES
Final build passes on main (after all merges) YES
Final tests pass on main YES
Success criteria evaluated (pass/fail for each) YES
ORCHESTRATOR's SPRINT-ASSESSMENT.md exists YES
Per-agent grades assigned YES
Carry-forward items documented YES
Worktrees cleaned up YES
Sprint branches cleaned up (or archived) YES

If gate fails: Complete the missing item before closing the sprint.


Gate Override

Any gate can be overridden by the operator with explicit approval. When overriding:

  1. State which gate is being overridden
  2. State the reason
  3. Document the override in the sprint assessment under "Exceptions"
  4. Accept the risk — overriding a gate means accepting that the gate's checks were not met

ORCHESTRATOR cannot override gates unilaterally. Only the operator can override.


Quick Reference

Gate 0: Plan Approved         → Operator approves proposal → generate docs
Gate 1: Pre-Dispatch          → All files exist, all complete → dispatch agents
Gate 2: Wave Transition (×N)  → All Wave N agents COMPLETE → dispatch Wave N+1
Gate 3: Agent Completion (×N) → Agent's work verified → mark COMPLETE
Gate 4: Merge Readiness       → All agents done + RED TEAM reviewed → LEAD merges
Gate 5: Sprint Close          → Assessment complete, cleanup done → sprint COMPLETE