Problem IDs: P0, P1, P4, P6
Objective
Move rollout capture, verification, failure diagnosis, corrective data, policy update, and regression testing to an available physical arm.
Preserve safety limits, emergency stop, calibration, timing, and failed-run artifacts.
Acceptance
At least one policy update is justified by physical failure evidence and re-evaluated on the same hardware. A well-instrumented negative result passes.
Problem IDs: P0, P1, P4, P6
Objective
Move rollout capture, verification, failure diagnosis, corrective data, policy update, and regression testing to an available physical arm.
Preserve safety limits, emergency stop, calibration, timing, and failed-run artifacts.
Acceptance
At least one policy update is justified by physical failure evidence and re-evaluated on the same hardware. A well-instrumented negative result passes.