upstream: adopt the 2026-09-03 T3 batch, pass two (in progress) #641
ci.yml
on: pull_request
Matrix: desktop_prime_packaged_smoke
Matrix: prime_background_platform
Matrix: test_server
Annotations
10 errors and 11 warnings
|
Check
Process completed with exit code 1.
|
|
Test Server 1
Canceling since a higher priority waiting request for ci-261 exists
|
|
Test Server 2
Canceling since a higher priority waiting request for ci-261 exists
|
|
Test Server 2
The operation was canceled.
|
|
Test
Canceling since a higher priority waiting request for ci-261 exists
|
|
Test
The operation was canceled.
|
|
Test Server 3
Canceling since a higher priority waiting request for ci-261 exists
|
|
Desktop Prime Packaged Smoke (win)
Canceling since a higher priority waiting request for ci-261 exists
|
|
Desktop Prime Packaged Smoke (win)
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for ci-261 exists
|
|
Rust
The process '/usr/bin/git' failed with exit code 128
|
|
Check
The process '/usr/bin/git' failed with exit code 128
|
|
Prime Background Platform (ubuntu-24.04)
The process '/usr/bin/git' failed with exit code 128
|
|
Release Smoke
The process '/usr/bin/git' failed with exit code 128
|
|
Desktop Prime Packaged Smoke (linux)
The process '/usr/bin/git' failed with exit code 128
|
|
Test Server 1
The process '/usr/bin/git' failed with exit code 128
|
|
Test Server 2
The process '/usr/bin/git' failed with exit code 128
|
|
Test Server 2
Retention days cannot be greater than the maximum allowed retention set within the repository. Using 14 instead.
|
|
Test
The process '/usr/bin/git' failed with exit code 128
|
|
Test Server 3
The process '/usr/bin/git' failed with exit code 128
|
|
Desktop Prime Packaged Smoke (win)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 128
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
thread-transfer-results
|
505 Bytes |
sha256:a9e9fbdc507d4bd2b651232a2a98736c86087ebee10426127fe5579772882f71
|
|