Skip to content

upstream: adopt the 2026-09-03 T3 batch, pass two (in progress) #636

upstream: adopt the 2026-09-03 T3 batch, pass two (in progress)

upstream: adopt the 2026-09-03 T3 batch, pass two (in progress) #636

Triggered via pull request September 3, 2026 22:46
Status Cancelled
Total duration 1m 40s
Artifacts 1

ci.yml

on: pull_request
Matrix: desktop_prime_packaged_smoke
Matrix: prime_background_platform
Matrix: test_server
Fit to window
Zoom out
Zoom in

Annotations

16 errors and 11 warnings
Check
Process completed with exit code 1.
Release Smoke
Canceling since a higher priority waiting request for ci-261 exists
Release Smoke
The operation was canceled.
Desktop Prime Packaged Smoke (win)
Canceling since a higher priority waiting request for ci-261 exists
Desktop Prime Packaged Smoke (win)
The operation was canceled.
Test
Canceling since a higher priority waiting request for ci-261 exists
Test
The operation was canceled.
Test Server 1
Canceling since a higher priority waiting request for ci-261 exists
Test Server 1
The operation was canceled.
Test Server 3
Canceling since a higher priority waiting request for ci-261 exists
Test Server 3
The operation was canceled.
Test Server 2
Canceling since a higher priority waiting request for ci-261 exists
Test Server 2
The operation was canceled.
CI
Canceling since a higher priority waiting request for ci-261 exists
Desktop Prime Packaged Smoke (linux)
Canceling since a higher priority waiting request for ci-261 exists
Desktop Prime Packaged Smoke (linux)
The operation was canceled.
Rust
The process '/usr/bin/git' failed with exit code 128
Check
The process '/usr/bin/git' failed with exit code 128
Prime Background Platform (ubuntu-24.04)
The process '/usr/bin/git' failed with exit code 128
Release Smoke
The process '/usr/bin/git' failed with exit code 128
Desktop Prime Packaged Smoke (win)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 128
Test
The process '/usr/bin/git' failed with exit code 128
Test Server 1
The process '/usr/bin/git' failed with exit code 128
Test Server 3
The process '/usr/bin/git' failed with exit code 128
Test Server 2
The process '/usr/bin/git' failed with exit code 128
Test Server 2
Retention days cannot be greater than the maximum allowed retention set within the repository. Using 14 instead.
Desktop Prime Packaged Smoke (linux)
The process '/usr/bin/git' failed with exit code 128

Artifacts

Produced during runtime
Name Size Digest
thread-transfer-results
504 Bytes
sha256:96bb249d92ee1a96742b1ebb48ede60282a597d8360e7a789eb029dd61e4a3ee