Skip to content

upstream: adopt the clean half of the 2026-09-03 T3 batch (65 commits) #633

upstream: adopt the clean half of the 2026-09-03 T3 batch (65 commits)

upstream: adopt the clean half of the 2026-09-03 T3 batch (65 commits) #633

Triggered via pull request September 3, 2026 20:44
Status Success
Total duration 7m 27s
Artifacts 1

ci.yml

on: pull_request
Matrix: desktop_prime_packaged_smoke
Matrix: prime_background_platform
Matrix: test_server
Fit to window
Zoom out
Zoom in

Annotations

11 warnings
Rust
The process '/usr/bin/git' failed with exit code 128
Prime Background Platform (ubuntu-24.04)
The process '/usr/bin/git' failed with exit code 128
Release Smoke
The process '/usr/bin/git' failed with exit code 128
Desktop Prime Packaged Smoke (linux)
The process '/usr/bin/git' failed with exit code 128
Test Server 1
The process '/usr/bin/git' failed with exit code 128
Test Server 3
The process '/usr/bin/git' failed with exit code 128
Test Server 2
The process '/usr/bin/git' failed with exit code 128
Test Server 2
Retention days cannot be greater than the maximum allowed retention set within the repository. Using 14 instead.
Check
The process '/usr/bin/git' failed with exit code 128
Test
The process '/usr/bin/git' failed with exit code 128
Desktop Prime Packaged Smoke (win)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 128

Artifacts

Produced during runtime
Name Size Digest
thread-transfer-results
505 Bytes
sha256:49660add09bea7f618b8571b057ad40309af0cf0bcad819d18e2500242a5256d