Skip to content

Merge pull request #171 from pylon-code/upstream/2026-08-29-expo #479

Merge pull request #171 from pylon-code/upstream/2026-08-29-expo

Merge pull request #171 from pylon-code/upstream/2026-08-29-expo #479

Triggered via push August 31, 2026 04:09
Status Success
Total duration 5m 37s
Artifacts 1

ci.yml

on: push
Matrix: test_server
Fit to window
Zoom out
Zoom in

Annotations

8 warnings
Rust
The process '/usr/bin/git' failed with exit code 128
Release Smoke
The process '/usr/bin/git' failed with exit code 128
Test Server 1
The process '/usr/bin/git' failed with exit code 128
Check
The process '/usr/bin/git' failed with exit code 128
Test Server 3
The process '/usr/bin/git' failed with exit code 128
Test Server 2
The process '/usr/bin/git' failed with exit code 128
Test Server 2
Retention days cannot be greater than the maximum allowed retention set within the repository. Using 14 instead.
Test
The process '/usr/bin/git' failed with exit code 128

Artifacts

Produced during runtime
Name Size Digest
thread-transfer-results
506 Bytes
sha256:7ac047019c214e81bd8d05847e725e5e266fbb0579302ddd3958bc3582e72c5c