Skip to content

chore(upstream): adopt the second 2026-08-19 T3 Code batch (#57) #182

chore(upstream): adopt the second 2026-08-19 T3 Code batch (#57)

chore(upstream): adopt the second 2026-08-19 T3 Code batch (#57) #182

Triggered via push August 19, 2026 16:57
Status Success
Total duration 5m 41s
Artifacts 1

ci.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

5 warnings
Release Smoke
The process '/usr/local/bin/git' failed with exit code 128
Mobile Native Static Analysis
The process '/opt/homebrew/bin/git' failed with exit code 128
Check
The process '/usr/local/bin/git' failed with exit code 128
Test
The process '/usr/local/bin/git' failed with exit code 128
Test
Retention days cannot be greater than the maximum allowed retention set within the repository. Using 14 instead.

Artifacts

Produced during runtime
Name Size Digest
thread-transfer-results Expired
504 Bytes
sha256:1c913ee195b2ff0c846b818813c33c8390e70c476c13581ac2bc3247d493e658