Skip to content

Improve referenced channels addressing #229

Improve referenced channels addressing

Improve referenced channels addressing #229

Triggered via push November 12, 2025 09:21
Status Failure
Total duration 25s
Artifacts

run-tests.yaml

on: push
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Run tests (3.10)
Process completed with exit code 1.
Run tests (3.12)
The strategy configuration was canceled because "build._3_10" failed
Run tests (3.12)
Process completed with exit code 1.
Run tests (3.11)
The strategy configuration was canceled because "build._3_10" failed
Run tests (3.11)
Process completed with exit code 1.
Run tests (3.8)
The strategy configuration was canceled because "build._3_10" failed
Run tests (3.8)
Process completed with exit code 1.
Run tests (3.8)
The operation was canceled.
Run tests (3.13)
The strategy configuration was canceled because "build._3_10" failed
Run tests (3.13)
The operation was canceled.
Run tests (3.14)
The strategy configuration was canceled because "build._3_10" failed
Run tests (3.14)
The operation was canceled.
Run tests (3.9)
The strategy configuration was canceled because "build._3_10" failed
Run tests (3.9)
The operation was canceled.