Disaster Recovery Plan (DRP)

Version: 1.0
Last Updated: April 2026
Document Owner: Operations Team
Review Cycle: Quarterly


Table of Contents

  1. Executive Summary
  2. Recovery Objectives
  3. Backup Strategy
  4. Recovery Procedures
  5. Disaster Scenarios
  6. Testing & Validation
  7. Communication Plan
  8. Roles & Responsibilities

Executive Summary

This Disaster Recovery Plan (DRP) defines procedures to restore ThemisDB operations in the event of a disaster. The plan establishes Recovery Time Objectives (RTO) and Recovery Point Objectives (RPO) for different failure scenarios and provides step-by-step recovery procedures.

Critical Success Factors

  • Automated Backups: Continuous incremental backups with point-in-time recovery
  • Geographic Redundancy: Multi-region replication for critical data
  • Regular Testing: Quarterly DR drills to validate recovery procedures
  • Clear Communication: Defined escalation paths and stakeholder notifications

Recovery Objectives

Recovery Time Objective (RTO)

RTO defines the maximum acceptable time to restore service after a disaster.

Disaster Scenario Target RTO Maximum Acceptable RTO
Single Node Failure 5 minutes 15 minutes
Data Center Outage 30 minutes 2 hours
Regional Disaster 2 hours 4 hours
Complete Data Loss 4 hours 8 hours
Ransomware Attack 6 hours 12 hours

Recovery Point Objective (RPO)

RPO defines the maximum acceptable data loss measured in time.

Disaster Scenario Target RPO Maximum Acceptable RPO
Single Node Failure 0 seconds (no data loss) 5 seconds
Data Center Outage 5 seconds 30 seconds
Regional Disaster 1 minute 5 minutes
Complete Data Loss 15 minutes 1 hour
Ransomware Attack 1 hour 24 hours

Service Level Targets

Metric Target Measurement
Annual Availability 99.95% ~4.4 hours downtime/year
Monthly Availability 99.9% ~43 minutes downtime/month
Mean Time to Detect (MTTD) < 2 minutes Monitoring alerts
Mean Time to Recover (MTTR) < 30 minutes Incident resolution

Backup Strategy

Backup Types

1. Continuous Replication

  • Frequency: Real-time
  • Method: Asynchronous replication to standby nodes
  • RPO: < 5 seconds
  • Use Case: High availability, failover

2. Incremental Snapshots

  • Frequency: Every 15 minutes
  • Method: RocksDB checkpoint + WAL archival
  • RPO: 15 minutes
  • Retention: 24 hours (96 snapshots)

3. Full Backups

  • Frequency: Daily at 02:00 UTC
  • Method: Complete database snapshot
  • RPO: 24 hours
  • Retention: 30 days

4. Long-term Archives

  • Frequency: Weekly (Sunday 03:00 UTC)
  • Method: Compressed full backup
  • RPO: 7 days
  • Retention: 1 year (52 backups)

Backup Storage

Primary Backup Location:
  Provider: S3-compatible object storage
  Region: Primary region + 1
  Encryption: AES-256-GCM at rest
  Lifecycle: Automated retention policies

Secondary Backup Location:
  Provider: S3-compatible object storage
  Region: Geographic redundant region
  Encryption: AES-256-GCM at rest
  Lifecycle: Mirrored from primary

Cold Storage Archive:
  Provider: Glacier/Archive storage
  Retention: 7 years
  Compliance: GDPR, SOC 2, HIPAA

Backup Verification

All backups are automatically verified:

# Automated backup verification (runs after each backup)
themisdb-cli backup verify \
  --backup-id <backup-id> \
  --check-integrity \
  --check-consistency \
  --sample-restore

# Expected verification checks:
# ✓ Checksum validation
# ✓ File integrity check
# ✓ Metadata validation
# ✓ Sample data restore test
# ✓ Corruption detection

Recovery Procedures

Procedure 1: Single Node Failure Recovery

Scenario: One database node fails in a multi-node cluster
RTO: 5 minutes | RPO: 0 seconds

Detection

# Monitoring alert triggers
ALERT NodeDown
  IF up{job="themisdb"} == 0
  FOR 1m
  LABELS { severity="critical" }

Recovery Steps

  1. Assess Impact (< 1 minute)

    # Check cluster status
    themisdb-cli cluster status
    
    # Verify other nodes healthy
    themisdb-cli health --all-nodes
  2. Automatic Failover (< 2 minutes)

    • Load balancer automatically routes traffic to healthy nodes
    • Cluster rebalances shard assignments
    • No manual intervention required
  3. Replace Failed Node (< 2 minutes)

    # Start replacement node
    kubectl scale deployment themisdb --replicas=3
    
    # Node automatically joins cluster
    # Data replication begins automatically
  4. Verify Recovery (< 1 minute)

    # Confirm cluster health
    themisdb-cli cluster status
    # Expected: All nodes HEALTHY, all shards balanced
    
    # Run health check
    curl http://load-balancer/health
    # Expected: HTTP 200 OK

Success Criteria:

  • All nodes reporting healthy
  • All shards balanced
  • No client-visible errors
  • Replication caught up

Procedure 2: Data Center Outage Recovery

Scenario: Complete data center loss
RTO: 30 minutes | RPO: 5 seconds

Detection

# Multi-node failure in same availability zone
ALERT DataCenterDown
  IF count(up{job="themisdb", az="us-east-1a"} == 0) > 2
  FOR 2m
  LABELS { severity="critical" }

Recovery Steps

  1. Declare Disaster (< 5 minutes)

    # Incident commander assesses situation
    # Confirm: Multiple nodes down in same DC
    # Decision: Activate DR plan
    
    # Notify stakeholders
    themisdb-cli incident declare \
      --type datacenter_failure \
      --severity critical \
      --notify all
  2. Activate Secondary Region (< 10 minutes)

    # Promote secondary region to primary
    themisdb-cli failover promote \
      --region us-west-2 \
      --force \
      --verify-data-consistency
    
    # Update DNS to point to new region
    aws route53 change-resource-record-sets \
      --hosted-zone-id Z1234567890ABC \
      --change-batch file://dns-failover.json
    
    # Expected output:
    # ✓ Secondary region promoted to primary
    # ✓ All shards active
    # ✓ DNS updated (TTL: 60s)
    # ✓ Traffic routing to new region
  3. Verify Application Connectivity (< 5 minutes)

    # Test from multiple locations
    for region in us-west eu-west ap-south; do
      curl https://themisdb.$region.example.com/health
    done
    
    # Run synthetic transactions
    themisdb-cli test synthetic-transactions \
      --workload production \
      --duration 5m
  4. Monitor Recovery (< 10 minutes)

    # Watch key metrics
    themisdb-cli monitor \
      --metrics qps,latency,errors \
      --duration 10m \
      --alert-on-anomaly
    
    # Expected: Metrics return to normal within 10 minutes

Success Criteria:

  • Secondary region serving all traffic
  • < 5 seconds data loss
  • All clients reconnected
  • Performance within 10% of baseline

Procedure 3: Point-in-Time Recovery (PITR)

Scenario: Data corruption or logical error detected
RTO: 2 hours | RPO: 15 minutes

Use Cases

  • Accidental data deletion
  • Application bug corrupted data
  • Malicious data modification
  • Schema migration gone wrong

Recovery Steps

  1. Identify Corruption Window (< 15 minutes)

    # Analyze audit logs
    themisdb-cli audit query \
      --start "2026-01-24T00:00:00Z" \
      --end "2026-01-24T06:00:00Z" \
      --user admin \
      --action DELETE
    
    # Find last known good state
    themisdb-cli backup list \
      --before "2026-01-24T05:00:00Z" \
      --verified-only
  2. Create Current State Snapshot (< 10 minutes)

    # Preserve current state for forensics
    themisdb-cli backup create \
      --type full \
      --label "before-restore-$(date +%Y%m%d-%H%M%S)" \
      --priority high
  3. Restore to Point-in-Time (< 60 minutes)

    # Perform PITR to last good snapshot
    themisdb-cli restore pitr \
      --target "2026-01-24T04:45:00Z" \
      --backup-id backup-20260124-0430 \
      --verify-consistency \
      --dry-run
    
    # Review dry-run results
    # If acceptable, execute restore:
    themisdb-cli restore pitr \
      --target "2026-01-24T04:45:00Z" \
      --backup-id backup-20260124-0430 \
      --verify-consistency \
      --execute
  4. Verify Data Integrity (< 20 minutes)

    # Run data validation
    themisdb-cli validate database \
      --check-indexes \
      --check-constraints \
      --check-references
    
    # Compare key metrics
    themisdb-cli metrics compare \
      --baseline backup-20260124-0430 \
      --current now \
      --tolerance 1%
  5. Resume Operations (< 15 minutes)

    # Bring database back online
    themisdb-cli maintenance-mode disable
    
    # Notify stakeholders
    themisdb-cli incident update \
      --status resolved \
      --notify all

Success Criteria:

  • Data restored to target timestamp
  • All integrity checks pass
  • No data inconsistencies
  • Applications functioning normally

Procedure 4: Ransomware Recovery

Scenario: Ransomware attack detected
RTO: 6 hours | RPO: 1 hour

Detection

# Unusual patterns detected
ALERT RansomwareSuspected
  IF (
    rate(themisdb_delete_operations[5m]) > 1000 OR
    rate(themisdb_encryption_failures[5m]) > 10
  )
  FOR 5m
  LABELS { severity="critical" }

Recovery Steps

  1. Immediate Isolation (< 5 minutes)

    # Isolate affected systems
    themisdb-cli security isolate \
      --node all \
      --block-external \
      --preserve-forensics
    
    # Disable all user access
    themisdb-cli security revoke-all-tokens
    
    # Alert security team
    themisdb-cli incident declare \
      --type security_breach \
      --severity critical \
      --notify security-team
  2. Assess Damage (< 30 minutes)

    # Identify affected data
    themisdb-cli security scan \
      --check-integrity \
      --check-encryption \
      --output /security/scan-results.json
    
    # Find last clean backup
    themisdb-cli backup find-clean \
      --before-incident \
      --verify-integrity
  3. Rebuild from Clean Backup (< 4 hours)

    # Deploy new infrastructure (immutable)
    kubectl create namespace themisdb-recovery
    helm install themisdb-clean ./helm/themisdb \
      --namespace themisdb-recovery \
      --set security.hardened=true
    
    # Restore from verified clean backup
    themisdb-cli restore \
      --backup-id <last-clean-backup> \
      --namespace themisdb-recovery \
      --verify-integrity \
      --scan-malware
  4. Security Hardening (< 1 hour)

    # Apply security patches
    themisdb-cli security patch-all
    
    # Rotate all credentials
    themisdb-cli security rotate-credentials --all
    
    # Enable enhanced monitoring
    themisdb-cli security enable-enhanced-monitoring
  5. Gradual Restoration (< 30 minutes)

    # Bring services online with restricted access
    themisdb-cli service start --restricted-mode
    
    # Whitelist verified clients only
    themisdb-cli security allow-client \
      --verified-only \
      --require-mfa

Success Criteria:

  • Clean database restored
  • No malware detected
  • All credentials rotated
  • Enhanced security active
  • Forensics preserved

Disaster Scenarios

Scenario Matrix

Scenario Likelihood Impact RTO RPO Primary Response
Single node failure High Low 5 min 0 sec Auto-failover
AZ failure Medium Medium 30 min 5 sec Region failover
Region failure Low High 2 hr 1 min DR site activation
Data corruption Medium Medium 2 hr 15 min PITR restore
Ransomware Low High 6 hr 1 hr Isolation + rebuild
Hardware failure High Low 15 min 0 sec Replace + resync
Network partition Medium Medium 10 min 5 sec Route around
DDoS attack Medium Low 5 min 0 sec Rate limiting + CDN

Testing & Validation

DR Testing Schedule

Monthly Tests (30 minutes)

  • Backup verification
  • Restore test (non-production)
  • Failover simulation
  • Monitoring validation

Quarterly Tests (4 hours)

  • Full DR drill
  • Cross-region failover
  • Complete restore test
  • Team readiness assessment

Annual Tests (Full Day)

  • Disaster simulation exercise
  • Multi-scenario testing
  • Communication plan validation
  • Documentation review

Test Procedures

Monthly Backup Test

#!/bin/bash
# Monthly backup verification script

# 1. List recent backups
themisdb-cli backup list --last 30-days

# 2. Select random backup
BACKUP_ID=$(themisdb-cli backup list --last 30-days --format json | jq -r '.[0].id')

# 3. Verify backup
themisdb-cli backup verify --backup-id $BACKUP_ID

# 4. Test restore to staging
themisdb-cli restore \
  --backup-id $BACKUP_ID \
  --target staging \
  --verify

# 5. Run validation queries
themisdb-cli test queries \
  --environment staging \
  --suite smoke-tests

# 6. Generate report
themisdb-cli test report \
  --output /reports/dr-test-$(date +%Y%m%d).html

Quarterly DR Drill

#!/bin/bash
# Quarterly full DR drill

echo "=== DR DRILL: $(date) ==="

# 1. Simulate disaster
echo "Step 1: Simulating data center failure..."
themisdb-cli test simulate-disaster \
  --type datacenter-failure \
  --region us-east-1

# 2. Activate DR procedures
echo "Step 2: Activating DR procedures..."
themisdb-cli failover promote \
  --region us-west-2 \
  --test-mode

# 3. Validate recovery
echo "Step 3: Validating recovery..."
themisdb-cli test synthetic-transactions \
  --duration 15m \
  --target dr-region

# 4. Measure metrics
echo "Step 4: Measuring RTO/RPO..."
themisdb-cli test measure-recovery \
  --output /reports/dr-drill-metrics.json

# 5. Restore to normal
echo "Step 5: Restoring to normal operations..."
themisdb-cli failover restore \
  --region us-east-1

# 6. Generate report
echo "Step 6: Generating report..."
themisdb-cli test report \
  --type dr-drill \
  --output /reports/dr-drill-$(date +%Y%m%d).pdf

Communication Plan

Escalation Matrix

Severity Initial Response Escalation (15 min) Escalation (30 min)
P0 - Critical On-call engineer Engineering manager CTO + CEO
P1 - High On-call engineer Engineering manager VP Engineering
P2 - Medium On-call engineer Team lead Engineering manager
P3 - Low On-call engineer - -

Notification Templates

P0 - Critical Disaster

Subject: [P0 CRITICAL] ThemisDB Disaster - [SCENARIO]

Status: DISASTER IN PROGRESS
Severity: P0 - Critical
RTO: [X hours]
RPO: [Y minutes]

IMPACT:
- [Description of impact]
- [Affected services]
- [Estimated user impact]

CURRENT STATUS:
- Detection time: [HH:MM UTC]
- DR procedures activated: [HH:MM UTC]
- Expected recovery: [HH:MM UTC]

ACTIONS TAKEN:
- [Action 1]
- [Action 2]

NEXT STEPS:
- [Next step 1]
- [Next step 2]

Incident Commander: [Name]
War Room: [URL/Bridge number]

Updates will be provided every 15 minutes.

Stakeholder Communication

Stakeholder Timing Method Content
Internal team Immediate Slack + Email Technical details
Management < 15 min Email + Call Business impact
Customers < 30 min Status page Service status
Partners < 1 hour Email Impact assessment

Roles & Responsibilities

Disaster Recovery Team

Incident Commander

  • Declares disaster
  • Coordinates recovery effort
  • Makes key decisions
  • Communicates with stakeholders

Technical Lead

  • Executes recovery procedures
  • Validates technical steps
  • Monitors system health
  • Reports to Incident Commander

Database Administrator

  • Manages backup/restore
  • Verifies data integrity
  • Optimizes recovery process
  • Documents technical details

Communications Lead

  • Drafts status updates
  • Notifies stakeholders
  • Manages status page
  • Coordinates with PR/Legal

Security Lead (if applicable)

  • Assesses security impact
  • Conducts forensics
  • Implements hardening
  • Coordinates with security team

Appendices

Appendix A: Emergency Contacts

Incident Commander: [Name] - [Phone] - [Email]
Technical Lead: [Name] - [Phone] - [Email]
DBA On-Call: [Phone] - [PagerDuty]
Security Team: [Email] - [Phone]
Management: [Email] - [Phone]
Cloud Provider Support: [Phone] - [Ticket Portal]

Appendix B: Critical System Information

Production Environment:
- Cluster ID: prod-cluster-001
- Primary Region: us-east-1
- DR Region: us-west-2
- Backup Location: s3://themisdb-backups
- Monitoring: https://grafana.example.com

Access Credentials:
- Vault Path: /secret/themisdb/dr
- Break-glass Account: dr-admin@example.com
- Emergency Access: [Documentation link]

Appendix C: Checklist for Annual DR Plan Review

  • RTO/RPO targets still appropriate
  • Backup retention periods sufficient
  • Contact information up to date
  • Recovery procedures tested
  • Infrastructure changes documented
  • Compliance requirements met
  • Team training completed
  • DR budget allocated

Document History

Version Date Author Changes
1.0 2026-01-24 Operations Team Initial version

Approval

Role Name Signature Date
CTO
VP Engineering
Security Officer
Compliance Officer

Next Review Date: 2026-04-24
Document Classification: Internal - Confidential