Skip to content

ci: run native and portable checks across six concurrent runners #10

ci: run native and portable checks across six concurrent runners

ci: run native and portable checks across six concurrent runners #10

Triggered via pull request September 8, 2026 21:09
Status Failure
Total duration 3m 16s
Artifacts

ci.yml

on: pull_request
Matrix: native
Fit to window
Zoom out
Zoom in

Annotations

10 errors
x86_64-linux
Process completed with exit code 1.
x86_64-win
The strategy configuration was canceled because "native.x86_64-linux_runs-on_3427" failed
aarch64-linux
The strategy configuration was canceled because "native.x86_64-linux_runs-on_3427" failed
aarch64-linux
The operation was canceled.
riscv64-linux
The strategy configuration was canceled because "native.x86_64-linux_runs-on_3427" failed
riscv64-linux
The operation was canceled.
s390x-linux
The strategy configuration was canceled because "native.x86_64-linux_runs-on_3427" failed
s390x-linux
The operation was canceled.
powerpc64le-linux
The strategy configuration was canceled because "native.x86_64-linux_runs-on_3427" failed
powerpc64le-linux
The operation was canceled.