You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Convert the current open-issue surface into a bounded execution and decision queue. This is the authoritative coordination snapshot for the 2026-08-18 closeout pass. It does not replace the owning issues, authorize scientific claims, submit compute, or create a second readiness framework.
The queue is ordered by repository integrity, evidence truthfulness, release/legal exposure, and ability to unblock several downstream paths. New research expansion remains below closeout, publication, and already-authorized evidence work.
Operating rules
Keep no more than three P0/P1 implementation PRs and two campaign/operations lanes active at once.
One issue has one implementation owner. Do not open a competing PR when an exact owner is named below.
state:working means a live PR or validated implementation exists. state:ready means a bounded slice can start. Blocked parents are not agent dispatch targets.
Close an issue only after its exact acceptance criteria pass on the merged head. A merged helper or green smoke is not evidence that an empirical parent is complete.
Preserve fallback, degraded, missing, incomplete, and unavailable states explicitly.
Existing canonical rulings on #7409, #7411, #7412, and #6095 are terminal until a later explicit reopen event; #7449 must make the audit respect them.
Parked / post-closeout work
Keep the #7381 scenario-intelligence programme and children #7392–#7399 as proposal-stage/post-closeout work. The only currently justified dissertation-supporting vertical slice is the existing trace-dossier path under #7086. Do not launch new training, search, forecasting, clustering, or planner campaigns from the portfolio epics.
Audit and completion
For each queue revision, post:
issues closed because merged work fully satisfies acceptance;
issues changed from ready to working because an active PR exists;
blocked issues whose prerequisites closed;
duplicate PR/issue paths retired;
decisions made, with exact ruling tokens;
campaign/operation receipts obtained or exact blockers retained.
This coordination issue closes when the P0/P1 integrity queue is empty, authorized operations have terminal receipts or explicit deferrals, and the residual open surface is correctly classified as ready, blocked, decision-required, parked, or post-closeout.
This packet is preparation evidence only. It never overrides live labels, exact claim state, branch state, typed dependencies, domain gates, compute authority, release authority, or scientific evidence rules.
Purpose
Convert the current open-issue surface into a bounded execution and decision queue. This is the authoritative coordination snapshot for the 2026-08-18 closeout pass. It does not replace the owning issues, authorize scientific claims, submit compute, or create a second readiness framework.
The queue is ordered by repository integrity, evidence truthfulness, release/legal exposure, and ability to unblock several downstream paths. New research expansion remains below closeout, publication, and already-authorized evidence work.
Operating rules
state:workingmeans a live PR or validated implementation exists.state:readymeans a bounded slice can start. Blocked parents are not agent dispatch targets.Immediate execution queue
mainwithout weakening the optimized-mode invariant test.mainfast/required CI is green.stacked_prsdirect merge path.main-protectiononly after the caller/workflow fixes are merged.main.Authorized operations and campaign queue
These lanes are ordered independently from local code work. Do not substitute more preparation issues for a missing execution receipt.
pass_6_of_6.Dependency graph requiring explicit propagation
Maintainer decision queue
Resolve these before dispatching implementation that depends on the choice:
bump-radius-envelope-v2before the first durable report.document-pre-7128-verification-boundary; retain the current verifier default.share-explicit-campaign-id-pairacross launch and report contracts.record-no-doi-keep-not-rununless a named archival requirement justifies a deposit or clean reproduction.Existing canonical rulings on #7409, #7411, #7412, and #6095 are terminal until a later explicit reopen event; #7449 must make the audit respect them.
Parked / post-closeout work
Keep the #7381 scenario-intelligence programme and children #7392–#7399 as proposal-stage/post-closeout work. The only currently justified dissertation-supporting vertical slice is the existing trace-dossier path under #7086. Do not launch new training, search, forecasting, clustering, or planner campaigns from the portfolio epics.
Audit and completion
For each queue revision, post:
This coordination issue closes when the P0/P1 integrity queue is empty, authorized operations have terminal receipts or explicit deferrals, and the residual open surface is correctly classified as ready, blocked, decision-required, parked, or post-closeout.
This packet is preparation evidence only. It never overrides live labels, exact claim state, branch state, typed dependencies, domain gates, compute authority, release authority, or scientific evidence rules.