Skip to content

Otel integration

Otel integration #173

Re-run triggered April 20, 2026 07:21
Status Failure
Total duration 43s
Artifacts 2

release-pullrequest.yaml

on: pull_request
Matrix: Build and Push
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test
Process completed with exit code 1.
Build and Push (ubuntu-22.04)
buildx failed with: ERROR: failed to build: failed to solve: process "/bin/bash -o pipefail -c go mod download" did not complete successfully: exit code: 1
Build and Push (ubuntu-22.04-arm)
The strategy configuration was canceled because "build.ubuntu-22_04" failed
Build and Push (ubuntu-22.04-arm)
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
krateoplatformops~composition-dynamic-controller~NGP9U5.dockerbuild Expired
38 KB
sha256:2af1b48b07a98f4a9d6bdfb2f7811341a1983ee435169a024cadc1ff35b6d888