Skip to content

fix(release): sign and attest the image outside the job that builds it #2277

fix(release): sign and attest the image outside the job that builds it

fix(release): sign and attest the image outside the job that builds it #2277

Triggered via pull request September 10, 2026 12:21
Status Cancelled
Total duration 14m 40s
Artifacts –

ci.yml

on: pull_request
Matrix: cross_platform
Matrix: docker
🔎 Generated artifacts
2m 14s
🔎 Generated artifacts
📦 Site dependency audit
34s
📦 Site dependency audit
🧹 golangci-lint
2m 59s
🧹 golangci-lint
🛡️ govulncheck
21s
🛡️ govulncheck
📝 Markdown
19s
📝 Markdown
🎨 Site lint
39s
🎨 Site lint
📐 hadolint
18s
📐 hadolint
📄 server.json schema
11s
📄 server.json schema
🔗 Supply chain
34s
🔗 Supply chain
Matrix: typecheck
🌐 HTTP transport e2e
4m 48s
🌐 HTTP transport e2e
🔌 stdio transport e2e
2m 47s
🔌 stdio transport e2e
📊 SonarCloud
3m 58s
📊 SonarCloud
🖥️ Cross-platform
2s
🖥️ Cross-platform
🐳 Docker images
3s
🐳 Docker images
🧰 Checks
6s
🧰 Checks
Fit to window
Zoom out
Zoom in

Annotations

11 errors
🖥️ Cross-platform (windows-latest)
Canceling since a higher priority waiting request for ci-CI-refs/pull/689/merge exists
🖥️ Cross-platform (windows-latest)
The operation was canceled.
🖥️ Cross-platform (macos-latest)
Canceling since a higher priority waiting request for ci-CI-refs/pull/689/merge exists
🖥️ Cross-platform (macos-latest)
The operation was canceled.
🖥️ Cross-platform
Process completed with exit code 1.
🖥️ Cross-platform
the cross-platform suites did not succeed (cancelled)
🧰 Checks
Process completed with exit code 1.
🧰 Checks
a required job did not succeed; see the table above
✅ CI
Process completed with exit code 1.
✅ CI
a required job did not succeed; see the table above
CI
Canceling since a higher priority waiting request for ci-CI-refs/pull/689/merge exists