ci: add risk-based verification fast path #232
ci.yml
on: pull_request
Verification Router
5s
Matrix: linux-portability
Documentation
1m 20s
Quality Gates
1m 6s
Release Contracts
1m 42s
CI Summary
5s
Annotations
10 errors
|
Quality Gates
Process completed with exit code 101.
|
|
Documentation
Process completed with exit code 1.
|
|
Release Contracts
The run was canceled by @regenrek.
|
|
Release Contracts
The operation was canceled.
|
|
Portable Linux linux-x86_64
The run was canceled by @regenrek.
|
|
Portable Linux linux-x86_64
The operation was canceled.
|
|
Portable Linux linux-arm64
The run was canceled by @regenrek.
|
|
Portable Linux linux-arm64
The operation was canceled.
|
|
|
|
CI Summary
Process completed with exit code 1.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
verification-selection
Expired
|
2.25 KB |
sha256:99ee3441973439c094a938151c40cb3d8245ae164d20ac4e5ea97f835bc00cac
|
|