Report generation, YAML, etc #68

Description

@tommyod

Some interesting notes from the original probabilit proposal by @dafeda . There are things that we can consider in the future.


Report Generation

Report Generation: Export a summary of the experiment, including variable definitions, correlation matrices, plots, and statistics, in HTML, PDF, or Markdown.

A high-level method such as exp.report() can generate a default document with all the standard content:

  • Configuration Overview (sample size, sampling method, correlation strategy, etc.).
  • Variable List with definitions (names, distribution types, parameters).
  • Correlation Matrices used in the experiment.
  • Summary Statistics (mean, standard deviation, percentiles) for each variable or expression.
  • Visualizations (histograms, boxplots, correlation plots) for quick inspection.
  • Interpretations or Key Findings (optional narrative about which variables significantly influence results).
  • Output Formats: HTML, PDF, Markdown.
  • Customization: Possibly via YAML or similar config files to tailor the final report.

Example of yml

metadata:
  name: "Comprehensive Project Risk Analysis"
  description: "Complete risk analysis including direct costs, quality impacts, schedule effects, market variations, and risk adjustments"
  created_at: "2024-03-20T10:00:00Z"
  version: "1.0"
  sample_size: 10000
  sampling_method: "latin_hypercube"

variables:
  # Direct Material and Equipment
  Steel_Cost:
    type: "Normal"
    specification: "percentiles"
    parameters:
      p10: 800000
      p90: 1200000

  Maintenance_Cost:
    type: "LogNormal"
    specification: "percentiles"
    parameters:
      p10: 50000
      p90: 150000

  Daily_Fuel_Cost:
    type: "Uniform"
    parameters:
      min_val: 1000
      max_val: 1500

  Equipment_Lifetime:
    type: "Weibull"
    parameters:
      shape: 2.5
      scale: 5000

  # Labor and Productivity
  Productivity_Factor:
    type: "Triangular"
    specification: "percentiles"
    parameters:
      p10: 85
      p50: 100
      p90: 110

  Daily_Worker_Absences:
    type: "DiscreteUniform"
    parameters:
      min_val: 0
      max_val: 5

  # Quality and Inspection
  Quality_Score:
    type: "Beta"
    parameters:
      alpha: 5
      beta: 2

  Weekly_Quality_Issues:
    type: "Poisson"
    parameters:
      lambda_param: 3.5

  Successful_Inspections:
    type: "Binomial"
    parameters:
      n: 10
      p: 0.8

  Certification_Attempts:
    type: "NegativeBinomial"
    parameters:
      r: 3
      p: 0.6

  # Schedule and Timing
  Schedule_Duration:
    type: "BetaPERT"
    parameters:
      min_val: 8
      most_likely: 10
      max_val: 14

  Repair_Time:
    type: "Gamma"
    parameters:
      shape: 2
      scale: 1.5

  Time_Between_Failures:
    type: "Exponential"
    parameters:
      rate: 0.1

  Price_Variation:
    type: "StudentT"
    parameters:
      df: 5

  Overhead_Rate:
    type: "KDE"
    data: [0.12, 0.15, 0.14, 0.13, 0.16, 0.15, 0.14]

correlations:
  cost_variables:
    method: "iman-conover"
    variables:
      - Steel_Cost
      - Maintenance_Cost
    pairs:
      # Correlation coefficients can themselves be uncertain
      # Here we specify that the correlation between Steel_Cost and Maintenance_Cost
      # follows a truncated normal distribution with mean 0.6 and std 0.1
      # This allows for uncertainty in our correlation estimates to be included in the analysis
      - [Steel_Cost, Maintenance_Cost, {
          mean: 0.6,
          std: 0.1,  # or min/max, or p10/p90
          distribution: "truncated_normal"
        }]

  productivity_variables:
    method: "iman-conover"
    variables:
      - Productivity_Factor
      - Daily_Worker_Absences
    pairs:
      - [Productivity_Factor, Daily_Worker_Absences, -0.4]

  quality_schedule_variables:
    method: "iman-conover"
    variables:
      - Quality_Score
      - Schedule_Duration
      - Repair_Time
    pairs:
      - [Quality_Score, Schedule_Duration, -0.5]
      - [Quality_Score, Repair_Time, -0.3]
      - [Schedule_Duration, Repair_Time, 0.4]

expressions:
  equipment_replacement_cost:
    formula: "100000 * (10000 / Equipment_Lifetime)"

  rework_cost:
    formula: "Weekly_Quality_Issues * 5000 * (1 - Quality_Score)"

  inspection_cost:
    formula: "(10 - Successful_Inspections) * 2000"

  certification_cost:
    formula: "Certification_Attempts * 10000"

  downtime_cost:
    formula: "(Repair_Time / Time_Between_Failures) * Schedule_Duration * 5000"

  schedule_delay_cost:
    formula: "Schedule_Duration * Daily_Fuel_Cost"

  market_adjusted_cost:
    formula: "(1 + Price_Variation * 0.1)"

  direct_cost:
    formula: "(Steel_Cost + Maintenance_Cost + equipment_replacement_cost + Productivity_Factor * 1000000 * (1 + Daily_Worker_Absences * 0.01)) * market_adjusted_cost"

  indirect_cost:
    formula: "rework_cost + inspection_cost + certification_cost + downtime_cost + schedule_delay_cost"

  total_cost:
    formula: "(direct_cost + indirect_cost) * (1 + Overhead_Rate)"

outputs:
  plots:
    - type: "histogram"
      variable: "total_cost"
      title: "Total Project Cost Distribution"
    - type: "tornado"
      variable: "total_cost"
      title: "Sensitivity Analysis"

  report:
    format: "html"
    title: "Comprehensive Project Risk Analysis"
    description: |
      Complete risk analysis with all variables contributing to final cost:
      - Direct costs (materials, equipment, labor)
      - Quality and inspection impacts
      - Schedule effects
      - Market variations
      - Risk adjustments

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions