Scope
Establish the evidence and controls required before adaptive planning or checkpointed operator switching can move beyond Experimental/opt-in status.
Source of truth
docs/product-roadmap.md:27-31 and docs/experimental-promotion-criteria.md:20-33.
Acceptance criteria
- Define representative deployment profiles, confidence/cost thresholds, stale-feedback behavior, and rollback controls.
- Prove result equivalence and deterministic behavior against the fixed-plan baseline.
- Add EXPLAIN/metrics guard diagnostics and failure/fallback evidence.
- Keep the feature disabled by default until all gates pass.
- Update support/readiness status only for the selected surface.
Tracking: #1.
Scope
Establish the evidence and controls required before adaptive planning or checkpointed operator switching can move beyond Experimental/opt-in status.
Source of truth
docs/product-roadmap.md:27-31anddocs/experimental-promotion-criteria.md:20-33.Acceptance criteria
Tracking: #1.