feat(sbom): detector-asserted package origin in SBOM export #1174
ci.yml
on: pull_request
Lint
2m 9s
Test
2m 20s
Build
2m 16s
Format
11s
Module drift
41s
Generated docs drift
2m 20s
Docs link check
7s
npm wrapper
6s
Annotations
9 errors and 1 notice
|
Lint
Canceling since a higher priority waiting request for build-test-Build & Test-refs/pull/397/merge exists
|
|
Lint
The operation was canceled.
|
|
Build
Canceling since a higher priority waiting request for build-test-Build & Test-refs/pull/397/merge exists
|
|
Build
The operation was canceled.
|
|
Test
Canceling since a higher priority waiting request for build-test-Build & Test-refs/pull/397/merge exists
|
|
Test
The operation was canceled.
|
|
Build & Test
Canceling since a higher priority waiting request for build-test-Build & Test-refs/pull/397/merge exists
|
|
Generated docs drift
Canceling since a higher priority waiting request for build-test-Build & Test-refs/pull/397/merge exists
|
|
Generated docs drift
The operation was canceled.
|
|
Docs link check
Summary report available at: https://github.com/bomly-dev/bomly-cli/actions/runs/32337723010#summary-96330398043
|