Skip to content

Latest commit

 

History

History
69 lines (64 loc) · 4.07 KB

File metadata and controls

69 lines (64 loc) · 4.07 KB

Orchestration Progress

Status: completed

Phase: 9 / 9

Phase Name: Integration & Runtime Validation

Started: 2026-04-08T12:00:00Z

Phases

# Name Status
1 Core Foundation done
2 Foundation Systems + Test Infrastructure done
3 Core Systems + Foundation Tests done
4 Integration Systems + Core Tests done
5 Orchestration System + Integration System Tests done
6 Final Tests + System Review done
7 Unity Views & Integration Layer done
8 Editor Tools + Scene Setup done
9 Integration & Runtime Validation done

Agents

Agent Type Status Task Progress
unity-setup-1 unity_setup passed P9.T1: Card Sprites + Atlas Config 100%
tester-1 tester passed P9.T2: PlayMode Integration Tests 100%
coder-1 coder passed P9.T3: Final Runtime Validation 100%
reviewer-1 reviewer passed review-P9 100%
committer-1 committer passed commit-P9 100%

Tasks

ID Title Status Agent Complexity
P9.T1 Generate Card Sprites + Atlas Config done unity-setup-1 M
P9.T2 PlayMode Integration Tests done tester-1 M
P9.T3 Final Runtime Validation + Review done coder-1 L

Hooks

Hook Last Run Result
check-pure-csharp
check-naming-conventions

Log

[2026-04-08T12:00:00Z] [system] Orchestration started [2026-04-08T19:28:00Z] [system] Phase 1: Core Foundation — COMPLETE (7 atomic commits) [2026-04-08T19:45:00Z] [system] Phase 2: Foundation Systems + Test Infrastructure — COMPLETE (4 atomic commits) [2026-04-09T03:14:06Z] [system] Phase 3: Core Systems + Foundation Tests — COMPLETE (8 atomic commits) [2026-04-09T03:42:00Z] [system] Phase 4: Integration Systems + Core Tests — COMPLETE (5 atomic commits) [2026-04-09T04:12:00Z] [system] Phase 5: Orchestration System + Integration System Tests — COMPLETE (6 atomic commits) [2026-04-11T06:58:00Z] [system] Phase 6: Final Tests + System Review — COMPLETE (3 atomic commits) [2026-04-11T10:00:00Z] [system] Phase 7: Unity Views & Integration Layer — STARTED [2026-04-11T10:05:00Z] [system] P7-A group (5 tasks) — all completed [2026-04-11T10:20:00Z] [system] P7-B group (5 tasks) — all completed [2026-04-11T10:25:00Z] [agent:reviewer-1] Review PASS — asmdef ref fixed, unused members cleaned, duplicate DealCompleted fixed [2026-04-11T10:30:00Z] [system] Phase 7: Unity Views & Integration Layer — COMPLETE (8 atomic commits) [2026-04-11T11:00:00Z] [system] Phase 8: Editor Tools + Scene Setup — STARTED [2026-04-11T11:00:00Z] [agent:coder-1] Starting: P8.T1 CardAtlasGenerator (complexity: M, model: sonnet) [2026-04-11T11:05:00Z] [system] P8-A group (P8.T1) — completed [2026-04-11T11:10:00Z] [system] P8-B group (P8.T2, P8.T3, P8.T4) — all completed [2026-04-11T11:15:00Z] [agent:reviewer-1] Review PASS — zero compile errors, zero runtime errors, all criteria met [2026-04-11T11:20:00Z] [system] Phase 8: Editor Tools + Scene Setup — COMPLETE (8 atomic commits) [2026-04-11T12:00:00Z] [system] Phase 9: Integration & Runtime Validation — STARTED [2026-04-11T12:00:00Z] [agent:unity-setup-1] Starting: P9.T1 Card Sprites + Atlas Config (complexity: M, model: sonnet) [2026-04-11T12:00:00Z] [agent:tester-1] Starting: P9.T2 PlayMode Integration Tests (complexity: M, model: sonnet) [2026-04-11T12:05:00Z] [system] P9-A group (P9.T1, P9.T2) — all completed [2026-04-11T12:10:00Z] [agent:coder-1] Starting: P9.T3 Final Runtime Validation (complexity: L, model: sonnet) [2026-04-11T12:15:00Z] [agent:coder-1] Zero runtime errors. 375 EditMode + 37 PlayMode tests pass. Fixed asmdef + shared publisher. [2026-04-11T12:20:00Z] [agent:reviewer-1] Review PASS — all criteria met, 412 tests pass, zero errors [2026-04-11T12:25:00Z] [system] Phase 9: Integration & Runtime Validation — COMPLETE (6 atomic commits) [2026-04-11T12:25:00Z] [system] ORCHESTRATION COMPLETE — 9/9 phases done, 45/45 tasks complete