Skip to content

Merge pull request #7 from Ashish-dwi99/beta-v1 #12

Merge pull request #7 from Ashish-dwi99/beta-v1

Merge pull request #7 from Ashish-dwi99/beta-v1 #12

Triggered via push February 11, 2026 17:02
Status Failure
Total duration 42s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.11)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
Process completed with exit code 2.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.