So I've made a start at visually (no real confinment stats here) interpreting the sequence of events during the Cumbrian floods and Desmond flooding for a couple of reaches. What seems to be key are:
- a sequence of constricted flood flow followed by rapid expansion - these occur because of human confinment/constrictions or natural ones, and/or when a valley suddenly changes direction.(Examples 1-4)
- A large erodible confining margin - hi violumes of sediment supply upstream of a flow expansion results in floodplain deposition and avulsion/channel widening (Example 1,2,4).
- Changes in channel direction between confining margins where the receiving margin (downstream) is erodible (Example 1)

It is the sequence that is as important as the magnitude of change - ie Constriction into expansion + erodible margin = alot of change.
Erodible margin into constriction probably = limited change (transfer of sediment) until expansion then = deposition..
Legacy Infrastructure is important for constriction of flow (Example 4)
I think we're trapping confining margins, erodible and non-erodible margins,anthropogenic confining margins. Are we getting constrictions? What to do about expansion/constriction. How to allocate these attributes in terms of proportionof a 500m segment of channel centreline?


So I've made a start at visually (no real confinment stats here) interpreting the sequence of events during the Cumbrian floods and Desmond flooding for a couple of reaches. What seems to be key are:
It is the sequence that is as important as the magnitude of change - ie Constriction into expansion + erodible margin = alot of change.
Erodible margin into constriction probably = limited change (transfer of sediment) until expansion then = deposition..
Legacy Infrastructure is important for constriction of flow (Example 4)
I think we're trapping confining margins, erodible and non-erodible margins,anthropogenic confining margins. Are we getting constrictions? What to do about expansion/constriction. How to allocate these attributes in terms of proportionof a 500m segment of channel centreline?