Problem or opportunity
The project needs a practical first-month Urban Alien Adventures plan that preserves the slower narrative door of the two-door model and prevents the lane from becoming overflow for technical leftovers.
Proposed solution
Draft a 4-week Urban Alien Adventures launch schedule with two posts across the month. The allowed post types should be launch/world post, lore fragment, prototype artifact, or symbolic framework/merch-adjacent reveal. The plan should preserve anticipation and avoid forcing weekly output.
Acceptance criteria
Contribution area
Documentation
Related references
Should align with the two-door framing: Urban Alien Adventures is the narrative door focused on lore, atmosphere, worldbuilding, prototype glimpses, and authored reveals.
Problem or opportunity
The project needs a practical first-month Urban Alien Adventures plan that preserves the slower narrative door of the two-door model and prevents the lane from becoming overflow for technical leftovers.
Proposed solution
Draft a 4-week Urban Alien Adventures launch schedule with two posts across the month. The allowed post types should be launch/world post, lore fragment, prototype artifact, or symbolic framework/merch-adjacent reveal. The plan should preserve anticipation and avoid forcing weekly output.
Acceptance criteria
Contribution area
Documentation
Related references
Should align with the two-door framing: Urban Alien Adventures is the narrative door focused on lore, atmosphere, worldbuilding, prototype glimpses, and authored reveals.